How Do I Become a Quantitative Risk Analyst?

Risk Quantification Risk quantification refers to the range of possible outcomes of a project through the estimation of different risk interactions. The basic content of risk quantification is to determine which practices need to be addressed. Risk quantification involves an assessment of the interactions between different risks. Use this assessment to analyze the project's possible outputs, so first you need to decide which risks are worth responding to.

Risk quantification

Right!
Risk Quantification Risk quantification refers to the range of possible outcomes of a project through the estimation of different risk interactions. The basic content of risk quantification is to determine which practices need to be addressed. Risk quantification involves an assessment of the interactions between different risks. Use this assessment to analyze the project's possible outputs, so first you need to decide which risks are worth responding to.
Chinese name
Risk quantification
Foreign name
Risk Quantification
Field
economics
Fundamental contents
Determine what practices need a response
Points for
Deterministic and non-deterministic
Adopting technology
Risk quantification is used to measure the degree of risk probability and the impact of risks on project objectives. It is based on risk management plans, risk and risk condition ranking tables, historical data, expert judgments and other planned results. Technology to obtain quantitative results such as quantitative sequence listings, project validation studies, and emergency resources required.
There are many factors that complicate the quantification of risk. These factors include:
1. Opportunities and threats can be mixed in unpredictable ways (for example, delays in schedules may prompt consideration of new strategies to reduce the overall project duration).
2. A single risk event may cause multiple consequences. Delayed delivery of a key part of the project will result in cost overruns, delays in schedules, fines and low-quality products.
3. An event (reduced cost) for one project stakeholder may threaten (reduced profit) for another project stakeholder.
4. Because of the use of mathematical methods, people may have the illusion of accuracy and reliability.
The basis for risk quantification includes:
Risk management planning;
Risk and risk condition ranking table;
Historical data: like analogy
The magnitude of the risk quantified loss should be measured from three aspects: the nature of the loss, the scope of the loss, and the time distribution of the loss.
Nature of loss: Is the loss political, economic, or technical?
1. Expected value method. The expected value method, which is the expected amount of funds, is an important indicator of risk assessment.
2. Sum of statistics. Statistical summation always adds up the estimated cost of each specific work topic to calculate the range of cost changes for the entire project.
3. Simulation method. Simulation uses hypothetical values or system models to analyze system behavior or system performance. The more common simulation method is to use the project model as the project framework to make the project schedule.
4. Decision trees. A decision tree is a diagram that is easy to understand for decision makers and illustrates the interactions between different decisions and related incidents.