What Do Sewer Inspectors Do?
In order to strengthen the management of sewers and septic tanks in central urban areas and improve urban environmental sanitation, according to the "People's Republic of China Urban Planning Law", "Building Law of the People's Republic of China", "Organization Law of the People's Republic of China Urban Residents Committee", "City Appearance and Environment" Health Management Regulations, Regulations on the Management of Urban Roads, Regulations on the Quality Management of Construction Projects, Regulations on the Management of Real Estate, Measures for the Implementation of the Urban Planning Law of the People's Republic of China by Jiangxi Province, Regulations on the Administration of Building Management in Jiangxi Province, The Laws and Regulations of Jiangxi Province on the Management of Real Estate in Urban Residential Communities and the Measures for the Administration of Urban Drainage Permits are formulated in accordance with the actual conditions of this city.
Measures for the management of sewers and septic tanks in downtown Ji'an
- This entry lacks an overview map . Supplementing related content makes the entry more complete and can be upgraded quickly. Come on!
- Chinese name
- Measures for the management of sewers and septic tanks in downtown Ji'an
- Address
- Ji'an
- Execution time
- October 1, 2007
- Publisher
- Ji'an Downtown Committee
- In order to strengthen the management of sewers and septic tanks in central urban areas and improve urban environmental sanitation, according to the "People's Republic of China Urban Planning Law", "Building Law of the People's Republic of China", "Organization Law of the People's Republic of China Urban Residents Committee", "City Appearance and Environment" Health Management Regulations, Regulations on the Management of Urban Roads, Regulations on the Quality Management of Construction Projects, Regulations on the Management of Real Estate, Measures for the Implementation of the Urban Planning Law of the People's Republic of China by Jiangxi Province, Regulations on the Administration of Building Management in Jiangxi Province, The Laws and Regulations of Jiangxi Province on the Management of Real Estate in Urban Residential Communities and the Measures for the Administration of Urban Drainage Permits are formulated in accordance with the actual conditions of this city.
- First
- Article 2 The sewers referred to in these measures refer to the pipes that discharge rainwater, domestic sewage and sewage (waste) water from industrial and commercial services; the septic tanks referred to in these measures refer to the sedimentation of manure and fermentation and decay, and the precipitation through three compartments, Sewage is clarified before it is discharged into the sewer structures.
- Article 3 These Measures shall apply to the planning, construction and management of sewers and septic tanks within the urban planning area of Ji'an City Center.
- Article 4 The Municipal Planning and Construction Bureau is responsible for the planning and construction management of sewers and septic tanks. The Municipal Urban Management Bureau is responsible for the management and maintenance of sewers and septic tanks other than urban public sewers. In charge of the management of public housing, affordable housing, low-rent housing, and sewers and septic tanks in residential quarters, the Construction Bureau of Jizhou District is responsible for the construction and management of sewers and septic tanks under 15 meters in the area under its jurisdiction. Qingyuan District Construction Bureau Responsible for the construction and management of sewers and septic tanks in all streets in the urban area of Qingyuan District. The streets and neighborhood committees in the urban area are responsible for scattered residential buildings, personally constructed houses, and commercial housing where development companies no longer exist and have no property management. Maintenance and repair management of sewers and septic tanks.
- Article 5 Newly built residential quarters in cities and existing residential quarters with well-equipped shared facilities shall implement property management. Property management companies shall be responsible for the maintenance and repair of sewers and septic tanks; residential areas with incomplete shared facilities and relatively concentrated residential areas The district government will organize the rectification and create conditions to gradually implement property management. For scattered residential buildings, individually-built houses, and commercial housing where development companies no longer exist and there is no property management, property management agencies will be coordinated by the streets and neighborhood committees to conduct property management. The property service charge standard is formulated based on the actual conditions and service content of such houses, and is implemented after being reported to the Jizhou District or Qingyuan District Price Bureau for approval.
- Article 6 The Municipal Planning and Construction Bureau shall incorporate sewers and septic tanks into the urban drainage system planning content, organize the compilation of the urban drainage system plan, and implement it after submitting to the municipal government for approval.
- Article 7 The construction of sewers and septic tanks shall conform to the urban drainage system plan and the detailed plan of the project site, and to comply with relevant construction norms and technical standards.
- Article 8 Sewers for newly constructed or reconstructed projects must be separated by rainwater and sewage. If the existing sewers in the old urban area have not implemented rain and sewage diversion, they should be reconstructed.
- Article 9 The construction units of various municipal infrastructures in the central urban area shall organize the preparation of sewer planning and design schemes. The construction units of various types of housing construction shall organize the preparation of the plans and design plans for underground drainage pipes and vertical drainage and septic tanks before construction. The plan and design plan of the layout plan shall be submitted to the Municipal Planning and Construction Bureau for approval at the same time as the main project planning plan after being reviewed and approved by the Municipal Facilities Management Department. For projects that have not prepared the above schemes, construction project planning permits shall not be issued.
- Article 10 After the planning and design plan of the sewer and septic tank is approved, the construction unit shall hire a design unit with the corresponding qualification level to carry out the design. The diameter and materials of the sewer, the type and effective volume of the septic tank must be based on the residential population of the house. Factors such as the scale and the period of excretion of faeces are determined and meet the relevant norms and standards. The construction drawing design documents can only go through the construction formalities after being examined and approved by the construction drawing review agency of the construction project and reported to the Municipal Planning and Construction Bureau for the record.
- Article 11 During the construction process, without approval, the construction unit shall not change the position, pipe diameter, materials, and the position and volume of the septic tank. The Municipal Municipal Facilities Management Department supervises and manages the projects that connect to the city's public sewer barge interface, and conducts special completion inspection of the branch project.
- Article 12 New construction, expansion, and reconstruction projects that require access to urban public sewers shall go through the procedures for drainage permits at the Municipal Planning and Construction Bureau.
- Article 13 Construction project supervision units shall strengthen on-site supervision of the construction of sewers and septic tanks, and construction project quality supervision units shall strengthen the supervision and management of the quality of sewers and septic tanks and incorporate them into the scope of quality acceptance.
- Article 14 The Municipal Planning and Construction Bureau shall, when organizing the review of the comprehensive completion acceptance inspection of the construction project, include the construction of sewers and septic tanks as a key content, and the construction unit shall provide complete and detailed plans for the completion of the sewers and septic tanks. And on-site control and acceptance, for projects that do not meet the requirements of construction planning, design specifications and technical standards, the completion of the acceptance inspection filing procedures, the project shall not be delivered for use, and the housing management department shall not issue a house property certificate.
- Article 15 After the sewers and septic tanks are delivered for use, the maintenance and repair responsibilities are divided into:
- (1) The main and secondary arterial roads in the urban area of Jizhou District and urban public sewers with a branch road of 15 meters or more (including 15 meters) shall be maintained and repaired by the Municipal Facilities Management Department.
- (2) The Jizhou District Construction Bureau is responsible for the maintenance and repair of urban public sewers on roads below 15 meters in the urban area of Jizhou District.
- (3) The Qingyuan District Construction Bureau is responsible for the maintenance and repair of urban public sewers on all roads in the urban area of Qingyuan District.
- (4) The sewage mains and their inspection wells of the main and secondary arterial roads in Jizhou District shall be maintained and repaired by the units determined by the Municipal Planning and Construction Bureau in accordance with the authorization of the municipal government. Qingyuan District urban sewage mains and their inspection wells are maintained and repaired by Qingyuan District Construction Bureau.
- (5) The property owner is responsible for the maintenance and repair of sewers and septic tanks other than urban public sewer barges. Where the property owner employs a property management enterprise, the property management enterprise shall be responsible for maintenance and repair.
- (6) The daily maintenance and maintenance management of toilets, septic tanks, and sewers shared in the residential quarters are the responsibility of the community property management enterprises.
- (7) The sewers and septic tanks of directly-managed public housing and low-rent housing are maintained and repaired by the Municipal Real Estate Management Office; a house or house in a residential area has both directly-managed public housing, low-rent housing, and commodity housing or For affordable housing, the property owner who owns the majority of the property area is responsible for organizing maintenance and repair. If the property owner has hired a property management enterprise, the property management enterprise is responsible for maintenance and repair.
- (8) Sewers and septic tanks of scattered residential buildings, individually-built houses, and commercial houses where development companies no longer exist and have no property management. The property management agency coordinated by the street where the house is located and the neighborhood committee is responsible for maintenance and repair. For administrative agencies, the street and neighborhood committees shall lead the residents to organize maintenance and repair.
- Article 16 The burden of maintenance and repair costs:
- (1) The maintenance and repair costs of the main and secondary arterial roads in the urban area of Jizhou District and the city's public sewers over 15 meters (including 15 meters) are included in the municipal budget and shall be borne by the municipal finance.
- (2) The maintenance and repair costs of public sewers on roads below 15 meters in the urban area of Jizhou District shall be included in the district-level fiscal budget of Jizhou District and shall be borne by the finance of Jizhou District.
- (3) The maintenance and repair costs of the city's public sewers on all roads in the urban area of Qingyuan District shall be included in the district-level fiscal budget of Qingyuan District and shall be borne by Qingyuan District Finance.
- (4) The maintenance and repair costs of the sewage mains and their inspection wells in the primary and secondary arterial roads of Jizhou District shall be paid by the municipal finance from the sewage treatment fees collected, and the shortfall shall be resolved by the municipal finance. The maintenance and repair costs of urban sewage mains and their inspection wells in Qingyuan District shall be settled by the financial arrangements of Qingyuan District.
- (5) The maintenance and repair costs of sewers and septic tanks other than urban public sewer barges shall be borne by the property owners. Among them, if the property owner has hired a property management enterprise and the property management expenses it has paid include the daily operation and maintenance costs of shared facilities and equipment, the daily maintenance and repair costs of the sewers and septic tanks shall be borne by the property management company. The cost of renovation is listed from the house maintenance fund paid by the property owner. When the house maintenance fund is insufficient, the property owner will continue to raise it.
- (6) The daily maintenance and maintenance management costs of toilets, septic tanks, and sewers shared in the residential quarters shall be borne by the community property management enterprises, and the costs of overhaul, intermediate repairs, and renewal and reconstruction shall be paid from the house maintenance fund paid by the property owners. When the house maintenance fund is insufficient, the property owner will continue to raise funds.
- (7) The maintenance and repair costs of the sewers and septic tanks of directly-managed public housing and low-rent housing shall be borne by the Municipal Real Estate Management Office; there are both directly-managed public housing, low-rent housing and houses in a house or a residential area. For commercial or affordable housing, maintenance and repair costs are apportioned by the property owners according to the area of the property rights. If the property owners hire a property management company, the daily maintenance and maintenance management costs of the sewers and septic tanks shall be borne by the property management company. The expenses for renovation and renovation shall be listed from the house maintenance fund paid by the property owner. When the house maintenance fund is insufficient, the property owner shall continue to raise the funds.
- (8) The maintenance and repair costs of the sewers and septic tanks of scattered residential buildings, individually-built houses, and commodity houses that no longer exist in the development company and have no property management shall be borne by the property management agency coordinated by the streets and neighborhood committees, which have not yet been established. If the property management agency or the residents of this part fails to pay the property service fee, the street and the neighborhood committee shall coordinate the residents to raise funds for settlement.
- Article 17 The excrement removal and transportation of all septic tanks and public toilets in the urban area of Jizhou District shall be uniformly under the responsibility of the Municipal Environmental Sanitation Department. All the septic tanks and public toilets in Qingyuan District will be cleared and transported by Qingyuan District Municipal Public Utilities Management and Maintenance Office. Financial commitments in the original district. The Municipal Environmental Sanitation Office and the Qingyuan District Municipal Public Utilities Management and Maintenance Office shall determine the clearance period in accordance with national standards and regulations, and implement regular clearance, closed transportation, comprehensive utilization, and harmless treatment.
- Article 18 The person responsible for maintenance and removal and the person responsible for removal and removal shall find that the sewer is damaged, the sewage overflows, or the septic tank is blocked or overflowed, and they shall perform maintenance, dredging, removal or other remedial measures in a timely manner.
- Article 19 Relevant municipal and district departments, streets, neighborhood committees and property management companies shall strengthen publicity and education for citizens, guide citizens to form good living habits, and prevent sewers and septic tanks from being blocked due to improper use.
- Article 20 The following acts that damage the sewers and septic tanks are prohibited:
- (1) Unauthorized access to urban public sewer without obtaining a drainage permit;
- (2) Blocking sewers, septic tanks, or dumping garbage, slag, construction mud, etc. into drains, septic tanks;
- (3) Discharging highly toxic substances, flammable and explosive substances and harmful gases into the sewers and septic tanks;
- (4) Occupying pressure, disassembling, moving, piercing sewers or septic tanks without authorization;
- (5) Other acts that damage the sewers and septic tanks.
- Article 21 The following penalties shall be imposed on acts that violate these Measures in accordance with the relevant laws and regulations:
- (1) If the construction unit constructs sewers and septic tanks without planning approval or violates the provisions of the construction project planning permit, the Municipal Planning and Construction Bureau shall order the construction to be stopped, complete the relevant formalities, and impose 3% to 5% of the total project cost Fine
- (2) If the construction unit expressly or implicitly indicates that the construction enterprise fails to comply with the approved design drawings of the sewer and septic tanks, violates the mandatory standards for construction, and degrades the quality of the project, the city planning and construction bureau shall order it to make corrections and punish 200,000. If the construction company fails to carry out the construction according to the engineering design drawings or construction technical standards, the municipal planning and construction bureau shall order a fine and impose a fine of 2% to 4% of the contract price;
- (3) Anyone who acts in accordance with Article 20 of these Measures shall be warned by the Municipal Planning and Construction Bureau, ordered to make corrections within a time limit, and may be fined 10,000 to 30,000 yuan.
- Article 22 The person responsible for maintenance and repair fails to maintain and repair the sewer and septic tank in accordance with the prescribed technical standards and requirements, and the person responsible for cleaning and removal fails to remove and remove the feces in accordance with the prescribed cycle and transportation and processing requirements, affecting the city appearance and For environmental sanitation, the Municipal Urban Management Bureau shall impose punishment in accordance with the "Regulations on the Administration of Urban Appearance and Environmental Sanitation".
- Article 23 If a law enforcement officer neglects his duties, abuses his power, or engages in malpractices for personal gain, he shall be given administrative sanctions by a higher authority or his unit, which constitutes a crime and shall be investigated for criminal responsibility in accordance with law.
- Article 24 These Measures shall be implemented as of October 1, 2007.
- The first is to strengthen the management of sewers and septic tanks in central urban areas and improve urban environmental sanitation. According to the "People's Republic of China Urban Planning Law", "People's Republic of China Building Law", "Organization Law of the People's Republic of China Urban Residents Committee", "City Regulations on the Administration of City Appearance and Environmental Sanitation, Regulations on the Administration of Urban Roads, Regulations on the Quality Management of Construction Projects, Regulations on the Management of Real Estate, Measures for the Implementation of the Law of the People's Republic of China on Urban Planning by Jiangxi Province, and Regulations on Construction Management of Jiangxi Province , Regulations on Property Management of Urban Residential Communities in Jiangxi Province , Administrative Measures for the Management of Urban Drainage Permits and other laws and regulations, combined with the actual conditions of this city, formulated these measures.
- Article 2 The sewers referred to in these measures refer to the pipes that discharge rainwater, domestic sewage and sewage (waste) water from industrial and commercial services; the septic tanks referred to in these measures refer to the sedimentation of manure and fermentation and decay, and the precipitation through three compartments, Sewage is clarified before it is discharged into the sewer structures.
- Article 3 These Measures shall apply to the planning, construction and management of sewers and septic tanks within the urban planning area of Ji'an City Center.
- Article 4 The Municipal Planning and Construction Bureau is responsible for the planning and construction management of sewers and septic tanks. The Municipal Urban Management Bureau is responsible for the management and maintenance of sewers and septic tanks other than urban public sewers. In charge of the management of public housing, affordable housing, low-rent housing, and sewers and septic tanks in residential quarters, the Construction Bureau of Jizhou District is responsible for the construction and management of sewers and septic tanks under 15 meters in the area under its jurisdiction. Qingyuan District Construction Bureau Responsible for the construction and management of sewers and septic tanks in all streets in the urban area of Qingyuan District. The streets and neighborhood committees in the urban area are responsible for scattered residential buildings, personally constructed houses, and commercial housing where development companies no longer exist and have no property management. Maintenance and repair management of sewers and septic tanks.
- Article 5 Newly built residential quarters in cities and existing residential quarters with well-equipped shared facilities shall implement property management. Property management companies shall be responsible for the maintenance and repair of sewers and septic tanks; residential areas with incomplete shared facilities and relatively concentrated residential areas The district government will organize the rectification and create conditions to gradually implement property management. For scattered residential buildings, individually-built houses, and commercial housing where development companies no longer exist and there is no property management, property management agencies will be coordinated by the streets and neighborhood committees to conduct property management. The property service charge standard is formulated based on the actual conditions and service content of such houses, and is implemented after being reported to the Jizhou District or Qingyuan District Price Bureau for approval.
- Article 6 The Municipal Planning and Construction Bureau shall incorporate sewers and septic tanks into the urban drainage system planning content, organize the compilation of the urban drainage system plan, and implement it after submitting to the municipal government for approval.
- Article 7 The construction of sewers and septic tanks shall conform to the urban drainage system plan and the detailed plan of the project site, and to comply with relevant construction norms and technical standards.
- Article 8 Sewers for newly constructed or reconstructed projects must be separated by rainwater and sewage. If the existing sewers in the old urban area have not implemented rain and sewage diversion, they should be reconstructed.
- Article 9 The construction units of various municipal infrastructures in the central urban area shall organize the preparation of sewer planning and design schemes. The construction units of various types of housing construction shall organize the preparation of the plans and design plans for underground drainage pipes and vertical drainage and septic tanks before construction. The plan and design plan of the layout plan shall be submitted to the Municipal Planning and Construction Bureau for approval at the same time as the main project planning plan after being reviewed and approved by the Municipal Facilities Management Department. For projects that have not prepared the above schemes, construction project planning permits shall not be issued.
- Article 10 After the planning and design plan of the sewer and septic tank is approved, the construction unit shall hire a design unit with the corresponding qualification level to carry out the design. The diameter and materials of the sewer, the type and effective volume of the septic tank must be based on the residential population of the house. Factors such as the scale and the period of excretion of faeces are determined and meet the relevant norms and standards. The construction drawing design documents can only go through the construction formalities after being examined and approved by the construction drawing review agency of the construction project and reported to the Municipal Planning and Construction Bureau for the record.
- Article 11 During the construction process, without approval, the construction unit shall not change the position, pipe diameter, materials, and the position and volume of the septic tank. The Municipal Municipal Facilities Management Department supervises and manages the projects that connect to the city's public sewer barge interface, and conducts special completion inspection of the branch project.
- Article 12 New construction, expansion, and reconstruction projects that require access to urban public sewers shall go through the procedures for drainage permits at the Municipal Planning and Construction Bureau.
- Article 13 Construction project supervision units shall strengthen on-site supervision of the construction of sewers and septic tanks, and construction project quality supervision units shall strengthen the supervision and management of the quality of sewers and septic tanks and incorporate them into the scope of quality acceptance.
- Article 14 The Municipal Planning and Construction Bureau shall, when organizing the review of the comprehensive completion acceptance inspection of the construction project, include the construction of sewers and septic tanks as a key content, and the construction unit shall provide complete and detailed plans for the completion of the sewers and septic tanks. And on-site control and acceptance, for projects that do not meet the requirements of construction planning, design specifications and technical standards, the completion of the acceptance inspection filing procedures, the project shall not be delivered for use, and the housing management department shall not issue a house property certificate.
- Article 15 After the sewers and septic tanks are delivered for use, the maintenance and repair responsibilities are divided into:
- (1) The main and secondary arterial roads in the urban area of Jizhou District and urban public sewers with a branch road of 15 meters or more (including 15 meters) shall be maintained and repaired by the Municipal Facilities Management Department.
- (2) The Jizhou District Construction Bureau is responsible for the maintenance and repair of urban public sewers on roads below 15 meters in the urban area of Jizhou District.
- (3) The Qingyuan District Construction Bureau is responsible for the maintenance and repair of urban public sewers on all roads in the urban area of Qingyuan District.
- (4) The sewage mains and their inspection wells of the main and secondary arterial roads in Jizhou District shall be maintained and repaired by the units determined by the Municipal Planning and Construction Bureau in accordance with the authorization of the municipal government. Qingyuan District urban sewage mains and their inspection wells are maintained and repaired by Qingyuan District Construction Bureau.
- (5) The property owner is responsible for the maintenance and repair of sewers and septic tanks other than urban public sewer barges. Where the property owner employs a property management enterprise, the property management enterprise shall be responsible for maintenance and repair.
- (6) The daily maintenance and maintenance management of toilets, septic tanks, and sewers shared in the residential quarters are the responsibility of the community property management enterprises.
- (7) The sewers and septic tanks of directly-managed public housing and low-rent housing are maintained and repaired by the Municipal Real Estate Management Office; a house or house in a residential area has both directly-managed public housing, low-rent housing, and commodity housing or For affordable housing, the property owner who owns the majority of the property area is responsible for organizing maintenance and repair. If the property owner has hired a property management enterprise, the property management enterprise is responsible for maintenance and repair.
- (8) Sewers and septic tanks of scattered residential buildings, individually-built houses, and commercial houses where development companies no longer exist and have no property management. The property management agency coordinated by the street where the house is located and the neighborhood committee is responsible for maintenance and repair. For administrative agencies, the street and neighborhood committees shall lead the residents to organize maintenance and repair.
- Article 16 The burden of maintenance and repair costs:
- (1) The maintenance and repair costs of the main and secondary arterial roads in the urban area of Jizhou District and the city's public sewers over 15 meters (including 15 meters) are included in the municipal budget and shall be borne by the municipal finance.
- (2) The maintenance and repair costs of public sewers on roads below 15 meters in the urban area of Jizhou District shall be included in the district-level fiscal budget of Jizhou District and shall be borne by the finance of Jizhou District.
- (3) The maintenance and repair costs of the city's public sewers on all roads in the urban area of Qingyuan District shall be included in the district-level fiscal budget of Qingyuan District and shall be borne by Qingyuan District Finance.
- (4) The maintenance and repair costs of the sewage mains and their inspection wells in the primary and secondary arterial roads of Jizhou District shall be paid by the municipal finance from the sewage treatment fees collected, and the shortfall shall be resolved by the municipal finance. The maintenance and repair costs of urban sewage mains and their inspection wells in Qingyuan District shall be settled by the financial arrangements of Qingyuan District.
- (5) The maintenance and repair costs of sewers and septic tanks other than urban public sewer barges shall be borne by the property owners. Among them, if the property owner has hired a property management enterprise and the property management expenses it has paid include the daily operation and maintenance costs of shared facilities and equipment, the daily maintenance and repair costs of the sewers and septic tanks shall be borne by the property management company. The cost of renovation is listed from the house maintenance fund paid by the property owner. When the house maintenance fund is insufficient, the property owner will continue to raise it.
- (6) The daily maintenance and maintenance management costs of toilets, septic tanks, and sewers shared in the residential quarters shall be borne by the community property management enterprises, and the costs of overhaul, intermediate repairs, and renewal and reconstruction shall be paid from the house maintenance fund paid by the property owners. When the house maintenance fund is insufficient, the property owner will continue to raise funds.
- (7) The maintenance and repair costs of the sewers and septic tanks of directly-managed public housing and low-rent housing shall be borne by the Municipal Real Estate Management Office; there are both directly-managed public housing, low-rent housing, and houses For commercial or affordable housing, maintenance and repair costs are apportioned by the property owners according to the area of the property rights. If the property owners hire a property management company, the daily maintenance and maintenance management costs of the sewers and septic tanks shall be borne by the property management company. The expenses for renovation and renovation shall be listed from the house maintenance fund paid by the property owner. When the house maintenance fund is insufficient, the property owner shall continue to raise the funds.
- (8) The maintenance and repair costs of the sewers and septic tanks of scattered residential buildings, individually-built houses, and commodity houses that no longer exist in the development company and have no property management shall be borne by the property management agency coordinated by the streets and neighborhood committees, which have not yet been established. If the property management agency or the residents of this part fails to pay the property service fee, the street and the neighborhood committee shall coordinate the residents to raise funds for settlement.
- Article 17 The excrement removal and transportation of all septic tanks and public toilets in the urban area of Jizhou District shall be uniformly under the responsibility of the Municipal Environmental Sanitation Department. The excretion and transportation costs shall be included in the municipal budget and shall be borne by the municipal finance. All the septic tanks and public toilets in Qingyuan District will be cleared and transported by Qingyuan District Municipal Public Utilities Management and Maintenance Office. Financial commitments in the original district. The Municipal Environmental Sanitation Office and the Qingyuan District Municipal Public Utilities Management and Maintenance Office shall determine the clearance period in accordance with national standards and regulations, and implement regular clearance, closed transportation, comprehensive utilization, and harmless treatment.
- Article 18 The person responsible for maintenance and removal and the person responsible for removal and removal shall find that the sewer is damaged, the sewage overflows, or the septic tank is blocked or overflowed, and they shall perform maintenance, dredging, removal or other remedial measures in a timely manner.
- Article 19 Relevant municipal and district departments, streets, neighborhood committees and property management companies shall strengthen publicity and education for citizens, guide citizens to form good living habits, and prevent sewers and septic tanks from being blocked due to improper use.
- Article 20 The following acts that damage the sewers and septic tanks are prohibited:
- (1) Unauthorized access to urban public sewer without obtaining a drainage permit;
- (2) Blocking sewers, septic tanks, or dumping garbage, slag, construction mud, etc. into drains, septic tanks;
- (3) Discharging highly toxic substances, flammable and explosive substances and harmful gases into the sewers and septic tanks;
- (4) Occupying pressure, disassembling, moving, piercing sewers or septic tanks without authorization;
- (5) Other acts that damage the sewers and septic tanks.
- Article 21 The following penalties shall be imposed on acts that violate these Measures in accordance with the relevant laws and regulations:
- (1) If the construction unit constructs sewers and septic tanks without planning approval or violates the provisions of the construction project planning permit, the Municipal Planning and Construction Bureau shall order the construction to be stopped, complete the relevant formalities, and impose 3% to 5% of the total project cost Fine
- (2) If the construction unit expressly or implicitly indicates that the construction enterprise fails to comply with the approved design drawings of the sewer and septic tanks, violates the mandatory standards for construction, and degrades the quality of the project, the city planning and construction bureau shall order it to make corrections and punish 200,000. If the construction company fails to carry out the construction according to the engineering design drawings or construction technical standards, the municipal planning and construction bureau shall order a fine and impose a fine of 2% to 4% of the contract price;
- (3) Anyone who acts in accordance with Article 20 of these Measures shall be warned by the Municipal Planning and Construction Bureau, ordered to make corrections within a time limit, and may be fined 10,000 to 30,000 yuan.
- Article 22 The person responsible for maintenance and repair fails to maintain and repair the sewer and septic tank in accordance with the prescribed technical standards and requirements, and the person responsible for cleaning and removal fails to remove and remove the feces in accordance with the prescribed cycle and transportation and processing requirements, affecting the city appearance and For environmental sanitation, the Municipal Urban Management Bureau shall impose punishment in accordance with the "Regulations on the Administration of Urban Appearance and Environmental Sanitation".
- Article 23 If a law enforcement officer neglects his duties, abuses his power, or engages in malpractices for personal gain, he shall be given administrative sanctions by a higher authority or his unit, which constitutes a crime and shall be investigated for criminal responsibility according to law.
- Article 24 These Measures shall be implemented as of October 1, 2007. [1]