How do I install the spa?

Installation of bathroom cabinets requires average plumbing and carpentry skills and will take approximately eight to 15 hours. The necessary materials are as follows: cabinets purchased from home improvement or cabinet manufacturer, 1 x 4 inches (30.5 cm x 122 cm), pads, plasterboard screws, moldings and finishing nails. In addition, it is necessary to have the following tools at hand: hammer, bar, large level, pin search engines, tape measure, electric drill with drills and bits of screwdriver, SABRE SAW, clamps, utility knife, saw hole, hammer and nail set.

It is important to consider storage and function before purchasing a cabinet on a bath. Bathrooms are often small and have to accommodate many different objects such as towels and toiletries. Make sure the cabinets are deep and wide enough to store all the necessary items, and try to install the largest possible finished unit that works well in space.

to prepare an area of ​​FNEBO installation, firstLook at the old spa cabinets and sockets and turn off electricity and water. Then remove the sink from the counter and make sure you disconnect any electrical connection inside the cabinets. First remove the plate using the hammer to release it, and then the flat strip to completely release it from the existing cabinet. Remove the drawers and door of the cabinet and then the cabinet base.

If you want to start the spa installation, find the studs in the wall using the TOK locator and mark the center of the studs with a pencil. Draw an extension of the line up and down the walls and make sure they stay plumbing. Mark the areas and carefully measure where each cabinet will be hung. Before completing the bathroom installation plan, make sure you take into account the electric switches and output, plumbing and operating formulas.

Install the cabin spa only on the walls. First start with corner cabinets, attach a book along the bottom of the cabinet lineto help keep the cabinets during the installation. In each mounting rail, drill and connect two holes inside the cabinet and pass the plasterboard screws. Leave the adjacent cabinet on the book and terminal on the first cabinet. Condane cabinets together and to the wall by means of a pad during this process keep the plumber line.

hang the remaining cabinets in the same way. Remove all books and pads. If there is a gap between the cabinet and the wall, fill with the formation strip, stains and finishing to match the cabinets. If there is a space between the side of the cabinet and the end of the wall, trim the filling belt to close it. Fill strips can be purchased from the cabinet manufacturer and the plasterboard screws attached. It is important to seal all gaps because the bathrooms contain a lot of moisture and humid areas, they are breeding for molds.

Install the basic bathroom cabinets first install the corner cabinets as needed. To the back of the cabinet, drill and pilot holes. Set up withAn ryeneous cabinet in place and check that doors and drawers will work properly. If necessary, the cabinets are connected and used by pads to maintain plumbing lines until a number of cabinets are completed. Cut the holes for water and power lines as needed, before clamping and screwing; Carefully check the level before screwing the cabinets. When all cabinets are screwed in place, mount the top kick to cover the gap at the bottom.