How do I install stones from the tiles?

The process of installing circular paving stones is very similar to the procedures used to install any other type of tiles for the terrace floor. Before starting any work, it is necessary to collect basic tools and supplies, decide on design and carefully mark the location. Common tools and supplies for this project include Hammers, Stakes, Lord, Gravel, Písek and selected tiles. Inspiration for the design of a circular terrace can come from professionals in the field of landscaping, magazines for improvement of houses and books, or it can come from the imagination of the house owner. The installation process includes the designation of the space to be paved, the preparation of the ground, the correct setting of stones and filling the work to avoid any movement that can include the appearance of the design. Experts to improve houses indicate the best way to do this to place bets with a chain attached to the center of the area and stretch the string to the desired outer edge of the circle. Many people use chalk or spray on a barVU to clearly mark the circuit. When using the color, the Earth should be left alone until the product completely dry, before continuing the project.

The ground for a circular terrace must be prepared before one of the tiles can be set. This process involves digging to remove the grass and the upper layer of dirt and ensure that the area is as modern as possible, as any tendencies or decreases in the ground will lead to uneven surfaces after installing circular tiles. The gravel layer should also be added to the dug point, followed by sand to provide support and stability for the tiles as soon as it is placed. Using a player is an excellent way to ensure the surface of the sand level and smooth before switching to the last steps.

At this point, circular paved stones can be set in the prepared space according to the selected design. They should be comfortably seated in the sandand place close to each other to prevent the stones from coming out of place later. It is proposed that a piece of plastic trim should be placed around the outer edge of the structure to adapt to the terrace. To complete the project, Písek poured through the structure of a circular stone and brushed the broom into various cracks between the finishes. Water should be used to fully settled sand and other applications may be necessary until the cracks are completely filled.

IN OTHER LANGUAGES

Was this article helpful? Thanks for the feedback Thanks for the feedback

How can we help? How can we help?