How can I lay the interconnected tile tiles?
The connected tile tiles provide a smooth and robust surface that does not require mortar. These tiles can be laid after a few simple steps. First, create a plan of the intended finish of the Finiště and prepare the base pad. Next, install the weed barrier and start laying the outer rows of blocking tiles. Then install the remaining tiles and fill the cavities with sand between them. If the tiles are installed on the attic, the driveway must dig and turn on with compact sand and gravel. It may be necessary to rent energy equipment for this part of the project. If you pave over an existing concrete driveway, you will need a landscaping glue to secure the outer rows of the tiles to the surface. This is best done by digging the existing soil to sufficient depth and by postponing the area with compacted materials such as sand or gravel. The ideal depth for this excavation is approximately 6 inches (15 cm). Put the area with a crushed stoneOr by gravel, followed by a layer of sand and release the material thoroughly. Do not forget to maintain a surface level with a gradual slope from buildings or other structures.
After installation and compaction of the base material, place a leaf of field material on the surface to prevent future weed growth. You will need to install some type of trim around the area where the blocking tiles will be laid to hold them in place. Bed materials such as steel, wood, plastic or blocks can be used for this purpose. The installation of trim around the tiles also prevents the future penetration of grass. The edge of the yen required when installing blocking access tiles through an existing concrete surface.
Install the lines of the external federal federal first to provide stability for the inner section. Set the line using the string and bets, the inner part of the edge or the edge of the existing drive CESyou. The mountains in these external lines may need to be cut to fit properly against trim. A specially designed wet saw is usually the best tool for cutting blocking tiles. If you are using the landscape glue, work quickly to prevent material adjustment.
operating inside from the outer rows Install the inner tiles. It is important to correctly align the pieces to allow their mutual function. If you have a design drawn on paper, check it often during the installation process. After laying the tiles, you will have to fill the joints between them with sand. The sand brush into the sinuses with a broom until the joints are fully filled, and water the entire surface of the tiles to settle the material.