placing the tiles through concrete includes the same basic procedures as for laying tiles above dirt, but with several other considerations. Start by spreading the base layer of the sand and then organizing your tiles at the top. The sand is also used to fill the gaps between the tiles and their location in the place. When laying tiles through concrete, you must also consider the edges of the space and create immovable boundaries to ensure the circumference of the area.

Before you start, be sure to sweep concrete thoroughly and remove any residues. You may also want to consider coverage of any cracks in concrete with a barrier fabric weeds to prevent vegetation from growing through your tiles. Once the concrete is clean and prepared, spread the thin layer of tile on the concrete. The base can be packed as such, but it is basically a fine sand that can also be called Mason Sand. This layer should be about 1 inch (2.54 cm).

Create a circuit with a width of one finisher on the edge of the concrete by nI am without a base. This circuit will later be covered with mortar and is used to create a real estate. For the traditional installation of Finišerk, you would dig up depression for the dirt -containing tile. In traditional design, the higher country around the tiles keeps them safe. If you install tiles via concrete, there is no natural support for the perimeter and the immovable limit becomes necessary for the stability of the finishers.

As soon as the association's base is spread, start in one corner and start laying the tiles in the desired pattern. After all placed in place, remove the tiles from one edge and place them on the side. Mix enough mortar by monitoring the manufacturer's instructions for this side. Unfold the thin layer of mortar, working in small areas at once and replace the tile volume. Repeat this process for the remaining edges and then allow the mortar to be adjusted according to the manufacturer's instructions.

Once the mortar is set, use a wide broom like a push broom, to spread the polymer sand overupper part of the tiles. Be sure to push the sand into all the gaps between the tiles. This sand will be what locks the tiles in the place and ensures their flexible but stable joints. After the polymer sand is pushed into all the spaces and the excess has been swept away, spray the entire area with a fine fog of water. This sets the sand and completes the installation of the finishes.

One of them should be remembered when you put the tiles over the concrete, another height that you add to your existing concrete slab. If this board intersects the door, gate or other passage, the increase in height could affect the function of this area. The tiles and the base below them add height and be a ridge for a total increase in height. Make sure your door or gate will still have enough will to function properly with this addition to the height to the surface below it.