What are the best tips for installing concrete floors do-it-yourself?

DO-IT-YOURSELF Concrete floors are not difficult to install, but pay patience and attention to the details to create a final product that is straight, without cracks and ready for everyday use. One of the most important steps in installing concrete floors Do-it-it-yourself is to determine how much concrete is necessary to fill the desired surface area. This can be done by simple mathematical calculations, but one should surely be to check mathematics before buying concrete. It is always good to buy one or two other bags of concrete, just in case the calculations are turned off.

Before pouring concrete floors do-it-it-it-you, the installation program should prepare a surface on which it will pour concrete. This usually includes digging into dirt, flattening of the surface, pouring a layer of crushed stone, gravel or ashes and all tamping down. This sub -layer must be as flat as possible to provide a uniform surface on which the concrete can dry and settle. ChtIf you check that the sub-layer is flat before pouring concrete floors Do-it-it-yourself, pound of betting in four corners of the floor surface and binding string to each corner. The chain should be measured several centimeters from the sub -layer at different places. Place the level on the string to see if they measure the level. This is just a rough estimate, so if the level is far, adjust the layer accordingly.

stronger concrete floors do-it-yourself will require reinforcement in the structure to prevent concrete from separation or cracking over time and under different weather conditions. Rear can be purchased in most hardware stores and must be cut to the right size for the floor. This can be done using cutting drives on a circular saw or angle grinder, or it can be done in a hardware store if the measurement is obtained in advance. Do not forget to purchase the support of the reinforcement that holds the the and the fleet from the forgery. You are aboutBSECKLY PERFORMANCE AND EASY IMPACED; They will hold the reinforcement from the sub -layer, so it ends in the middle of the drying concrete rather than at the bottom.

Cure of concrete requires some special attention. Make sure the concrete remains adequately moist during the initial curing and equalization, and if the concrete floor is exposed to the elements, do not forget to cover it by sail when it dries. This keeps the debris and excess moisture from the board. Leave the concrete drug up to 48 hours before continuing the building process.

IN OTHER LANGUAGES

Was this article helpful? Thanks for the feedback Thanks for the feedback

How can we help? How can we help?