What are the best tips for balancing the basement?
Balancing the basement is not a very difficult work, but it will take several days. Be sure to explore the different products used to balance the basement and understand that the compound, once it is dry, will not be able to support a significant amount of weight in itself. Another type of floor, such as tiles, wood or stone, is often placed through a finished product that helps to support the weight of furniture or other heavy objects. When starting the project, be sure to completely clean the space to allow open workspace.
The first step in balancing the basement floor is to clean and fill the existing concrete. The concurr's concurrent can be used to fill small holes and cracks and the seals should be pressed into the hole and flattened at the top to ensure a smooth surface. Allow them to dry behind the amount listed on the product tube. Meanwhile, clean the rest of the concrete by sweeping it thoroughly and getting rid of all residues.Racing tapes that will help create a clean edge when the leveling products are used later.
When balancing the floor in the basement, it is useful to know where the drops in the concrete are located. If you want to identify problem spots, take a long, straight plate that is light enough to easily handle. Place it on the ground and move it on the floor. Use a brand to indicate where there are gaps between the bottom of the plate and the top of the concrete. These are problems with problems that will require equalization. Once these problem stains are identified, it is time to mix the leveling compound used to balance the basement.
This compound is in fact a type of concrete that is mixed with water, and the solution is thin enough, that after pouring it will lightly light. It finds low spots and pool, but as soon as it enjoys it, it can be a helpful to level the top with a straight plate. MixThe ovant compound in the wheel or large bucket and pour the compound over the floor in the strips throughout the leg (0.3 meters). They can be aligned as a folded pool and then let it dry. The compound must dry up to 48 hours before any other floor material can be built on its peak.