What are the best tips for painting the basement?

There are a few steps to paint the basement to ensure good coverage and durability. Most types of floors in the basement can be painted, including wood, ceramic tiles, vinyl tiles, vinyl sheets and linoleum. Some house owners also painted concrete basement floors with good success. Regardless of the floor material, the surface may start before the painting must be properly prepared, which includes thorough cleaning, repairing cracks and allowing complete surface drying. The color application process includes the application of paints before adding color and design patterns. It is essential to remove all residues, dirt and wax from the floor surface, because the color and primer will not be able to hold otherwise on the surface. If the basement floor is made of ceramic tiles, it is recommended to grind the does after being cleaned to support better color adhesion. Once the floor is properly cleaned, the next step of the preparation is to repair cracks or holes in the floor. This step ensures thatE Color does not throw in the slots and Mar is the final appearance of the project.

The next step of painting the floor in the basement is to apply a quality primer to it. The first coat will need to set or cure for at least 12 hours before the additional coating can be used. After the second coat for the next 12 hours, the first coat of the color can be applied either by a color sprayer or painting by hand, with a paint cylinder equipped with a long handle. In most cases, it is proposed to apply at least two layers of color to apply at least 24 hours apart. Complete drying between each layer of color is necessary to ensure proper healing of color and dominate random shortcomings or defects.

When painting the basement, the last phase is to apply a waterproof sealant to protect the new surface. Most specialists in improvement of houses recommend a Urethan product for this work. After the finalThe coat will dry thoroughly, two to three layers of urethhane should be applied, allowing enough time to dry each coat. This step is ideal for protection of layers under and to support longer wear for a new floor.

IN OTHER LANGUAGES

Was this article helpful? Thanks for the feedback Thanks for the feedback

How can we help? How can we help?