What is involved in the installation of hardwood flooring?
with traditional hardwood floors capable of lasting more than 100 years, it is no wonder why many people have decided to install hardwood floors in their house. Installing hardwood flooring is a careful job that requires excellent carpentry skills. Not only are hard wood floors resistant, but they are also stunning. When considering the installation of hardwood flooring, it is important to understand everything involved. Whether the locality is a new design or a reconstruction, the area should be structurally healthy, level and without moans and whistling from the base. In addition, the area must be cooled or heated to the average room temperature and average humidity. If you do not do so, it will cause further expansion and contraction in wood, which can cause poor installation. Similarly, hardwood should be acclimatized to its surroundings for at least 72 hours of FNEBO the best installation. The sealing of the substrate prohibits moisture under the floor to reach hardwood boards. Before installing wooden afterthe splints do not need to remove the motherboard; However, it gives a newer look at older houses. The fourth round or shoe formation can be installed on the floors to allow the finished look if the motherboard is left.
As soon as the subnine is ready for installation, the door and boards made of hardwood should also be prepared. The door to the jam will have to be cut about 1/16 inches (0.16 cm) above the hardwood floor. This should be done carefully with a special tool used to cut the door. At least six to eight boards made of hardwood boards should be opened during installation. Because one box will be a slightly different shade than another, it is necessary to mix the boards from many different boxes to mix the shades and provide a more natural look.
Installing the first row of hardwood floor or baseline is the most important step of installationhardwood floors. If a mistake is made in this step, the whole room will be distorted. It is recommended to use the outer wall as a baseline because the measurement will be a real square. The basis should be a jumped chalk line along the outer wall, which will lead the installation.
After the baseline is introduced, the adhesive extends along its edge and the boards are pressed down. Each additional line is completed by spreading the adhesive, slipping the tongue of the new board into the groove of the board, which is on the floor, and repeats in the whole room. After the installation is complete, £ 75 (34 kg) of the cylinders must be turned over the floors to flatten the boards and the distributor evenly.
It is important to note that during the installation of a hard wood floor, the board should be distributed as a staircase, so none of the seams touch. Particular attention should be paid to end cuts that are close to the wall. End slices should follow the manufacturer's recommendations on the size of the gap to leave andHow to cut wood. All slices should be made using a table saw.