What Are the Different Engineering Jobs?

The four major projects refer to the four projects of Qinghai-Tibet Railway, West-East Power Transmission, West-East Gas Transmission, and South-to-North Water Diversion.

Four major projects

The north is severely dry and short of water, but the south has a lot of surplus water resources flowing into the sea in vain.
"Western Qi" mainly refers to Xinjiang, Qinghai, Sichuan, Chongqing and He
The distribution of hydropower resources and the load distribution of electricity in China are extremely unbalanced.
Yan Yuqing introduced that the eastern region has a developed economy and a shortage of mineral resources. It can only transport coal from other places to build thermal power plants. But Beijing, Guangdong, Shanghai and other eastern provinces and cities account for more than 40% of the country's electricity consumption.
West to East Route
The western region is rich in hydropower resources. Taking the main tributaries of the middle and upper reaches of the Yangtze River and international rivers in the southwest as examples, its developable installed capacity accounts for 60% of the nation s developable installed capacity. However, due to the underdeveloped economy, hydropower has to be allowed to run away in vain.
With the enhancement of national strength, the country decided to take hydropower development as one of the important measures for the development of the western region. In 2000, the west-to-east power transmission project has officially started: the power resources of Guizhou, Yunnan, Guangxi, Sichuan, Inner Mongolia, Shanxi, Shaanxi and other western provinces and regions will be transmitted to Guangdong, Shanghai, Jiangsu, Zhejiang, and Beijing, Tianjin, where power is scarce. , Tang area.
The transmission of electricity from the west to the east is a landmark project in the western development.
During the "Tenth Five-Year Plan" period, power transmission from the west to the east will form the northern, central, and southern routes. The northern line will transmit power from Inner Mongolia, Shaanxi, and other provinces to the North China Power Grid. Five years later, 2.7 million electricity will be transmitted to the Beijing-Tianjin-Tangshan area Kilowatts; the central line will transmit power from Sichuan and other provinces to central and eastern China power grids; the southern line will transmit power from Yunnan, Guizhou, Guangxi and other provinces to southern China, and 10 million kilowatts will be transmitted to Guangdong in five years. Hongjiadu Hydropower Station, Yinzidu Hydropower Station, Wujiangdu Hydropower Station Expansion Project, the first batch of China's "west-to-east power transmission" projects, were started simultaneously in Guizhou on November 8, 2000.
"From the big plate of the country, there are three roads: South, Middle, and North." Yan Yuqing explained that South Road sends electricity from Guizhou, Yunnan, and Guangxi to Guangdong, and Middle Road sends electricity from Sichuan, Chongqing, and Three Gorges to East China, and North Road The Beijing-Tianjin-Tangshan area receives electricity from the upper Yellow River and Shanxi and Inner Mongolia.
During the "Tenth Five-Year Plan" period, the state will focus on accelerating the construction of power and transmission lines for the "west-to-east power transmission" south line. Hydropower stations and transmission lines in Sichuan, Guizhou, Guangxi, and Yunnan have begun.
"Four Major Projects" of Hengxian Government of Nanning City, Guangxi Zhuang Autonomous Region:
Hengxian Planning and Construction Bureau, in order to strengthen urban infrastructure construction, expand the urban framework, change the appearance of the city, improve the level of urbanization, enhance the city's taste, and gradually improve the county's public transportation system to solve the urban construction lag, the county's commercial network and incomplete functions, The level of urban management is not high enough. We will take the initiative to strengthen measures and make every effort to build four major projects, including administrative service area projects, urban center road reconstruction projects, county bus network system construction projects, and garden landscape projects. Take the new steps.
At present, various projects are in full swing, of which, the administrative service area project has completed an investment of 28.69 million yuan.
The planning and design of the roadway reconstruction project from Yingxuanmen to Haitang Bridge has been basically completed; the construction project of the eastern section of Baohua Middle Road has invested 470,000 yuan; the preliminary design of the construction of Baohua West Road has been completed; the construction of South Zhongshan Road has been put into construction The capital is 1.4 million yuan; the construction project of Minjiang Road has entered the demolition phase.
The special planning and design of the county bus network and parking lot has been commissioned by Shanghai Tongyi Urban Design Institute Co., Ltd. to carry out the planning and design.
The construction of the first phase of the reconstruction of Hengzhou Park started in November; the second phase of Haitang Park has invested 100,000 yuan in construction funds; in the street tree improvement project, the improvement of the tree species on Chang'an Avenue has been completed.

IN OTHER LANGUAGES

Was this article helpful? Thanks for the feedback Thanks for the feedback

How can we help? How can we help?