What Is a Green Architect?
Green building engineer is currently a profession with a talent shortage in the market. At present, major universities in China have almost no counterparts in green building, and the knowledge system of green building is very complicated. Domestic green building knowledge and courses are few and unstructured, while foreign green building knowledge systems are not suitable for China's national conditions. In addition, China's large construction investment base, green building development is urgent, and the market demand for green building engineers is conceivable It is known that with the development of China's economy, the demand for green building talents will increase.
Green Building Consulting Engineer
Right!
- Green construction engineers are currently a talented occupation in the market. At present, there is almost no counterpart in major universities in China.
- The employment scope of green building engineers is very wide. Including: government building management departments or construction units, design units, construction enterprises, engineering construction supervision units, real estate development companies, engineering consulting companies, international engineering companies, investment and finance, etc. Colleges and universities and scientific research institutions are engaged in teaching or scientific research of related majors. And in the future, the scope of employment will be wider.
- The work of green building engineers runs through different stages in the entire life cycle of green building project approval, planning, design, plan review, construction, supervision, inspection, completion acceptance, approved sales, maintenance, and use. The main duties at each stage are as follows:
- 1. Preliminary design stage
- (1) Planning and analysis of the overall design concept of the green building project, confirmation of the project objectives, analysis of the technical measures and implementation strategies suitable for the project, and reporting to Party A of the design concept;
- (2) Analysis and arrangement of project data, clarifying the scope of project construction drawings and related plans that can be changed;
- (3) According to the design goals and concepts, complete the preliminary project plan, investment estimation, and star rating assessment;
- (4) Provide Party A with the "Pre-assessment Report on Green Buildings of the Project"
- (5) Provide a feasibility analysis report for the green ecological technology confirmed by Party A, including how to adjust the existing scheme, the application scope of the technology, the application effect, information on the manufacturer and the case, economic analysis, and construction period estimation.
- (6) Provide Party A with "Project Green Building Feasibility Study Report"
- 2. Deepen the design phase
- (1) Determine the technical requirements to be achieved by the project according to the star-rated goals confirmed by Party A and the self-evaluation conclusions of green building stars;
- (2) According to the project work plan and schedule, complete the consulting work of architectural design, mechanical and electrical design, landscape design, interior design and other related professional deepening design. Complete the technical and economic analysis of the design plan; and implement the technical points, economic analysis, and related products of the adopted technology;
- (3) Party B will participate in the technical guidance of the complete modification of the construction drawings. According to the determined design plan, Party B will provide relevant technical documents to guide the design of the construction drawings into the green building technology and detailed concepts. Provide proposals for modification and improvement of construction plans and guide the design of construction plans;
- (4) Complete the simulation analysis required for the green building star certification, and provide the corresponding analysis report;
- (5) Provide Party A with the "Technical Report on Project Green Building Design Scheme"
- 3. Identification declaration stage
- (1) In accordance with the requirements of the "Green Building Evaluation Standards", complete the analysis report of each plan;
- (2) Assist Party A to complete the application of green building design evaluation and mark certification, prepare and improve relevant application materials, and conduct on-site expert hearings and defenses;
- (3) Host and participate in review and evaluation, communicate with review units, and provide feedback and interpretation of review opinions;
- 4. Project Construction Phase
- (1) Green construction training for construction companies and real estate companies, introduction of green construction policies, the meaning of green construction, requirements for green construction, technical specifications for green construction, methods of organizing green construction, and the impact of green construction
- (2) Green construction planning consultation Conduct overall planning and green construction project planning for construction companies and real estate companies, guide the formulation of green construction goals, determine relevant green construction measures, and formulate organizational plans for green construction.
- (3) Guidance and evaluation of green construction project implementation plan for green construction, assist the project in green construction.
- (4) Assist enterprises to achieve green construction project assessment according to the plan.
- 5. Operational cooperation phase
- (1) Organize property company management and operation personnel to conduct green building technology introduction and green property management knowledge training;
- (2) Obtain evidence from operation management, compile corresponding record forms to guide the operation of property recording systems and equipment, regularly review the operation records, and monitor the operation of the building throughout the process to meet the requirements of declaration and on-site inspection;
- (3) Based on the specific conditions of the project, guide the property company to formulate the corresponding management system.
- 6. Reporting stage of operation evaluation mark
- (1) In accordance with the "Green Building Evaluation Standards", complete the analysis report of each plan and the overall deepening plan report of the green building;
- (2) Assist Party A in completing the application for green building evaluation and certification, prepare and improve relevant application materials, and conduct on-site expert defense;
- (3) Communicate with the review unit, and provide feedback and explanation on the review opinions.
Green building consulting engineer occupation name
- Green Building Engineer (English: Green Building Consulting Engineer: GBCE) Abbreviation: Green Building Engineer, Green Building Consultant.
Professional definition of green building consulting engineer
- Green building engineers refer to professionals who are engaged in professional management work in all aspects of green building project planning, design, design review, construction, supervision, testing, completion acceptance, approved sales, maintenance, and use.
Green building consulting engineer exam subjects
- The examination subjects are divided into four subjects: "Related Laws, Regulations and Policies", "Basic Theoretical Knowledge", "Practical Skills and Practice", and "Comprehensive Case Analysis".
Professional level of green building consulting engineer
- Vocational levels are divided into: advanced, intermediate, junior
Green Building Consulting Engineer Training Session
- Relevant laws and regulations and policies, "basic theoretical knowledge", "hands-on skills and practice", "comprehensive case analysis" four subjects each study 40 lessons (learning), a total of 160 hours.
Conditions for Green Building Consulting Engineers
- All citizens of the People's Republic of China abide by national laws and regulations, abide by professional ethics, and engage in engineering project service work in construction enterprises and institutions. Graduates of engineering, engineering economics, finance, and management majors who have graduated from colleges and technical secondary schools, who meet the requirements for green building (consulting) engineers (junior, intermediate, advanced) and participate in green building (consulting) engineers Relevant courses and training, and hold a certificate issued by CETTIC authorized training institutions, can apply to take the exam at the corresponding level.
Green Building Consulting Engineer Timeline
- 1. Online submission of test registration information:
- Spring: It is planned to be from 10:00 on January 5 to 18:00 on January 25
- Autumn: It is planned to be from 10:00 on June 10 to 18:00 on June 30
- 2. Examination eligibility review: Complete the eligibility review within 24 hours of online registration.
- 3 Online payment time: within 24 hours after completing the report and passing the qualification review to the online registration deadline;
- 4 examination time:
- National unified examination plan: The national unified examination for green building (consulting) engineers is organized once a year in spring and autumn.
- Summer: Planning the third weekend of March each year
- Winter: The third weekend of August is planned.
- "Relevant Laws, Regulations and Policies" 120 minutes, 9:00 am to 11:00 am on Saturday
- "Basic Theoretical Knowledge" single subject for 120 minutes, Saturday 14: 00-16: 00
- 180 minutes for each subject of "Practical Skills and Practice", Sunday 9: 00 ~ 12: 00
- 180 minutes for each subject of Comprehensive Case Study, Sunday 14: 00-17: 00
Green Building Consulting Engineer Application
- 1. ways of registration:
- Register online at (Official Website of China Construction Training Technical Guidance Center Green Building Engineer Vocational Examination Center).
- 2. Registration Notes:
- A. Fill in the "Green Building Engineer Examination Registration Form" and upload a personal 1-inch electronic version of the photo and a copy of the front and back of the ID card.
- B. Registration fee: 70 yuan / person.
- C. Examination fees: 45 yuan / time for elementary subjects, 135 yuan for the whole subject; 55 yuan / time for intermediate subjects, 165 yuan for the whole subject; 60 yuan / time for advanced subjects, 240 yuan for the whole subject.
- D. Payment method: online payment on the official website of the test center (successful payment means that the registration is successful, check to confirm whether the registration is successful).
- E. Admission ticket: print the admission ticket (with number, photo, ID number) on the official website of the test center.
- F. Qualification Approval: Candidates must hold their ID cards, admissions certificates, academic credentials, and proof of academic hours when entering the examination room.
- 3 Time to print your admission ticket: 10 days before the test.
- 4 Results query: Two months after the test, the results will be published online for query.
- 5. Exam passing score: Pass: 60% is the passing score line.
- 6. Grade validity period: two consecutive test cycles.
- 7. Certificate of Examination Pass:
- A. Issued, filed and inquired by China Employment Training Technical Guidance Center.
- B. Four months after the test, those who pass the test plan to arrange for collection at the employment center of the local Human Resources and Social Security Bureau.
Certificate of Green Building Consulting Engineer
- The China Employment Training Guidance Center and Vocational Skills Appraisal Center of the Ministry of Human Resources and Social Security issued professional certificates.