The process for the construction of the driveway is hot, hard and long work, but it is feasible for most homeowners if they are patient and are willing to take time to plan before building a driveway. In some cases, hiring the supplier or professional service for the construction of the driveway is a better choice, simply because these experts have more experience and will be able to complete the task quickly and well. If you intend to build a driveway on your own, try to remember that planning is a key part of the project: first immerse yourself in the head. Many areas have codes that specify the degree of driveway, materials that can be used, how the driveway connects to the road, and other problems: make sure you are in line with them. Once you understand the local building regulations, plan your driveway and make long sketches how wide it will be and grade: make these drawings very accurate because you use them to request buildingChoice and to build a driveway.

There are many options for designing driveways. Most people prefer the design of a single album that can accommodate a wide range of vehicles. The basic one -time driveway can be made of gravel and sand, or you can cover it with concrete, bricks, tiles and other materials. For a one -time driveway, plan a driveway that measures eight to ten feet (2.5 to three meters) across, and double this distance for the driveway of two cars. Building codes also often specify the thickness of the board: plan to at least four inches (10 centimeters) for cars and double this thickness for heavy trucks.

When designing a driveway, think about the location. Ideally, the driveway should run uphill for the best drainage. If this is not possible because your house is below the street level, plan installACI abundant drainage, especially around the garage, and ideally under the driveway in the form of culverts, especially if there is a low spot around the driveway. You do not want the water to come together on the driveway or in the garage, if you have it, and be sure to keep the entrance to the driveway lower than the garage to avoid leakage of water. You will also have to give the driveway so that the water does not match it; The preferred method is to dig on the driveway and create a peak in the middle that slopes on the sides. For a driveway, which is 20 feet wide, raise the highest point to five inches (12 centimeters).

As soon as you planned and let them approve, you can start building a driveway. First, prepare the place by digging and wrapping the padding, such as gravel and sand that allows drainage, creates a smooth surface for the driveway and prevents the driveway in the strut. This filler is essential: a plan on the least two tightly packed layer to create the incomeGame paths that last. After packing the filling, you can set oiled concrete forms: oil will prevent water leaching from concrete and weakening pouring. Next, pour the concrete and leave the expansion joints to avoid excessive cracking, and plan to work quickly to smooth out the concrete before setting it. Keep the concrete covered and damp for at least three days to cure correctly.

If you build well, it should take at least 20 years, especially if it takes care of it. The most important part of the process is planning: Make sure you know how much of each material you need when you are going to switch to each step of the process and how the driveway will look at the end. Recruiting friends and building friends to help you build a driveway to make this process going quickly and smoothly, and if you seem to be too daunting for you, don't be afraid to hire a renowned supplier.