The best materials for cosmic flooring are gravel, crushed stone or concrete, with the best of these options being concrete. Concrete will maintain moisture and mistakes. Construction work, which would have to be done in a climbing area, will be much easier with the finished concrete floor. After installing the footers, concrete should be poured and are in place. After starting framing, it will be difficult to install floors to browse the concrete. A typical browsing floor is simply dirt. The main reason for the construction of a house in a crawled area is to save money. Complete basement is a better choice, but additional costs may not adapt to the budget of the builder. If the right barrier and ventilation of steam are installed, the crawl spaces are adequate. After the footsteps and found the outside of the foundation, the French drainage system should be installed. If any part of the foundation is under stamp, these areas must be waterproof.
Before pouring the concrete pad, all plumbing or electric foundations must be made. At this point, a six -phase plastic steam barrier must be set on the ground in the crawl space. A better method is to introduce about 3 inches (7.62 cm) of crushed stone or gravel before setting the steam barrier.
After the introduction of the barrier par, it is possible to add steel reinforcement, but is not necessary. Half -inch (1.27 cm) Steel reinforcement can be added to a 24 -inch (61 cm) center or wire network before pouring concrete. Further steel reinforcement ensures that you ensure the best climbing floor.
The concrete slab should be poured 4 inches (10.16 cm). The floor can be installed, but it may not be necessary. In many cases, these are water heaters and furnaces installed in a crawl space.
If the existing cramping space floor is dirt, some improvements can be made to provide the owner of the house with the best possible browsing. Should be naInstAllana six -cell plastic barrier steam. About 3 inches (7.62 cm) of stone or crushed gravel can be applied to the plastic to hold on and allow work in the climbing area without tearing the plastic.