What are the best tips for installing bricks?

When installing bricks, carefully plan the location of the project, replace it with a durable material, allow sufficient drainage and thoroughly condensed after completion. Advanced planning prevents accidental damage to local service lines and allows the project coordinator to prepare space for drainage. Mensed edges and compacts protect the shape of the area and make it resistant to resist most types of weather conditions.

Before installing brick tiles, there may be where the pipe can run underground. The paved areas usually require digging to a depth of eight to ten inches (approximately 20 to 25 cm) below the final stage of the surface to allow basic rocks, sand and tiles. A public service company may be able to mark the map of the intended location, display the existing power, water and sewer lines to avoid them.

Before digging, mark the intended place and shape. Use a Garden hose that outlines the area and spray the color over the final design, noBo put the garden spikes in the edges of the area and connect them with a string. Kick in a defined location, including several other inches outside the brand to install the foothold.

Use the support edge to complete the circuit of the project. Obliance can be installed first to provide guide lines when installing masonry palms, although one side should generally be completed after installation of tiles to allow adjustments. This support edge will rest slightly below the surface of the area and can be covered with topsoil after completion. This type of edging material can be made of stone, wood or supple plastic designed for use specifically when installing bricks. Usually it can be cut off where it is necessary, and bend slightly to fit into any shape. This ensures that the bricks are not used to use the weight or in natural weathering and the erosion moves OT unevenly.

Before installing the ActFlash rocks make sure that the subsoil area allows water to forgive from home. This can be done by tying the string from the upper end to the lower end of the location and placing the level in the dug area. The subsoil should fall one inch (2.5 centimeters) every eight feet (2.4 meters) to ensure adequate drainage.

guarantees even flat base of sand, on which tiles can be placed using one inch (2.5 centimeters) PVC pipes as a guide. Place the pipe the same distance on the top of the base rock. Pour the sand into the terrace. Rest two for four pieces of wood on both PVC tubes and drag, align the sand evenly.

constantly check that the area is level as the work proceeds when installing bricks. Uneven bricks can stress on the surrounding areas and cause cracks due to uneven weight distribution. If the brick is not with the ones around it and gently click it with a rubber drumstick. If it sits too low toId the other sand and replace the brick, again using a mallet to become the surrounding stone.

Use a hand -held handling or compact board - available for rent from large devices - to settle the finishers to the site. Compact the area before and after sweeping the sand into the joints to secure the bricks. This creates a uniform surface and protects the terrace from moving and eroding over time.