What are the best tips for making tiles?

Tiles can allow you to reduce the cost of the tiles project and create your own designs. Although the production of tiles is a relatively simple task, there are several tips that can improve the project. Among the best tips are the use of several forms at a time to speed up the process, and the use of lubricants for molds usually facilitate easier tile removal. The use of pre -mixed concrete and removal of air bubbles from molds will generally lead to stronger and smoother pavement. The smoothing of the back of the tiles with a towel and covering them with plastic, while they cured, can also help create better tiles.

If you make tiles in large quantities, you will probably need several forms to complete the task in a reasonable time. The concrete must cure at least one day before it can be removed from the mold, so that the production of large amounts of tiles will require more forms. Because the rain can dilute the mixture and prevent it from curing to start this type of project is good to checkVat weather forecast. Choose an area far from direct sunlight to prevent the concrete from stiffening too quickly. Applying a thin coat of vegetable oil to the interior of the mold will allow the smoked federal device easier to release.

using pre -mixed concrete can ensure that the tiles are solid and strong. Before mixing concrete, make sure the molds are located at the soil level near the workspace. Use only enough water to create a moldable mixture and have a type of blade on hand to transfer concrete to the mold without spilling. If you add pebbles or stones to the concrete, mix them to the dry mixture before adding water. The color should usually be added to the wet mixture before poured into a mold.

In the production of concrete tiles, it is best to fill the molds to a depth of at least 2 inches (5 cm) for maximum strength. After filling the molds shake or vibrate them toAll air bubbles caught on the bottom were released. If you do a large number of finishers, it may be necessary to use a vibrating table for this task. Be sure to smooth the back of the federal man using a teaspoon to install the level. During the curing process, it may also be a good idea to cover the molds of plastic to keep the leaves and other remnants of concrete.

It is best to wait at least one day before the removal of finishers from the molds. When removing them, gently turn them on a soft surface to avoid rupture. Let the tiles cure at least two days before installation. The glaze or seal can be applied either before or after installation. Wait at least 28 days before using the tiles.

IN OTHER LANGUAGES

Was this article helpful? Thanks for the feedback Thanks for the feedback

How can we help? How can we help?