What are the best tips to remove the bathtub?
The removal of the bathtub can be an important part of the bathroom reconstruction. Avoiding shortcuts and the correct work will ensure the best results. Depending on where a person lives, the city regulations may require building permits before the bath removal and the last inspection, once the work is completed, especially if the pipeline is to be removed or replaced in the process. This means that the removal of the bathtub begins with the call of the local building department and check the requirements. From there, one should turn off the water, disconnect the pipes and all the seals that hold the bathtub in place and remove the bathtub. Any wall panels should be opened to provide access to the pipes and fittings of the bathtub. Otherwise, a hole should be cut in the wall to allow access to the pipeline, and be careful not to damage the pipes in this process. After accessing access, an adjustable key should be used to disconnect the bathtub, waste pipe and overflow pipe outflow. Any accessories mounted inside the bathtubThe place in the wall should be disconnected and removed.
After all the bathtub has been peeled to the wall, it can remove the clips that hold the bathtub to the wall, require removal of about 4 inches (10 cm) of the wall just above the bath. Using the crowbar, you can start to release the bathtub from the fasteners around the entire length of the bathtub. Once the clips are released, the removal of the bathtub should be gently extended. The removal of the bathtub is not work for one person; The bathtubs are very difficult, so it will take at least two people to slip from the wall. From there, the question is that it fits through the bathroom door if they are completely removed and not only moved.
After removing the old tub, the new bathtub is ready for installation. The new bathtub should be of the same size as the old one unless a complete reconstruction of pipes and fittings is planned. If the new bath is the same size as the old, it should slip into the place as the old slipped.
new bathtubAnd the pipeline should be carefully aligned and the bathtub is leveled. This can be done by placing the structural level on the edge of the tub and adding a bath pad if necessary to equalize it. Once the bathtub and pipes are aligned, attach the clips that hold the bathtub in place and connect the tubes and faucets accordingly.
If the city building department needs work control, plan it before continuing to replace the wall. Inspectors will have to see work on the pipeline and installation before checking. Once it is completed, if necessary, continue the next step. Replace parts of the wall that have been removed and apdocation. If necessary, replace the notice board or tiles and lower the seal around the bathtub to seal the bathtub and protect the wall.