What Are the Different Types of Cost Engineering Jobs?
Project costs are the expenses incurred in terms of labor, materials, engineering equipment, construction machinery shifts and their management, as well as the fees and taxes paid in accordance with regulations in order to achieve the quality standards for the contractor to implement the contract project.
Engineering cost
Right!
- Engineering cost is
- Project cost is divided into two aspects: direct and indirect .
- (1) Unit pricing (calculate the construction project cost for each project through special procedures); each construction project has its specific use, function, and scale, and the structure, space division, equipment configuration, and interior and exterior decoration of each project are all There are different requirements. The construction project must also adapt to the natural conditions such as climate, geology, and hydrology of the project in terms of structure and shape. This makes the construction project
- The main factors affecting engineering costs include: project attributes, personnel attributes, computer attributes, project results attributes, and other factors. In progress
- With the country
- (1) The relationship between project cost and project cost: From the perspective of English translation, both cost and cost can be expressed by COST. However, in domestic engineering practice, costs and construction costs are still different.
- The difference is mainly reflected in two aspects: the nature of the concept and the angle of the definition of the concept. In addition to cost, the cost also includes the profit tax created, that is, the cost is the sum of cost, tax, and profit, but the narrow concept of cost and cost are equivalent.
- The common point is mainly reflected in the similarities between the two components, both of which affect project profits. Therefore, the two are mixed in many places.
- (2) The relationship between engineering cost and engineering investment Both investment and cost are expenditures incurred to achieve a certain goal. The boundary between the two is fuzzy in some cases and can be transformed into each other in certain cases.
- (3) Engineering costs and engineering costs In order to avoid mentioning the position, but purely explore the method of management itself, some people have proposed the word "expense", and considered that cost is a more neutral word, out of position, but not too much emphasis on the owner Or contractor, just emphasize the necessary effort to complete the project