What are the best tips for erection of scaffolding?
When building scaffolds, a number of proven procedures should be followed. Before the components, planning and review of the regulations, the selection of the project will be set up. All parts should be checked before the crew of at least two people begins to build scaffolding below and before starting work on the next. The components should connect comfortably and workers should have robust boards where they could become safely connected to the scaffolding. The first guideline is good planning that should be held before any assembly. Planning includes reviewing all valid regulations and regulations and preparation of the area where the scaffolding will be built.
Another critical guideline is to choose the right scaffolding design. This decision is influenced by a number of factor, such as the height of the project, the weight that the scaffolding will have in normal and extraordinary circumstances, the type and duration of the work to be carried out, and the requirements for pedestrians. Once the correct design is selected, they should be an explorationMans the components themselves, and these parts show signs of excessive wear and discarded tears, as well as bent or corroded tubes or clutches. In general, scaffolding components should be made by the same manufacturer and metal parts should be made of the same metal to prevent the galvanic reaction.
The crew that builds the scaffolding should always consist of at least two people, one delivering the materials to the other. The scaffolding process starts from bottom to top. The scaffolding base should consist of vertical pipes attached to the metal motherboard, which is attached to a 2 x 10 -inch (5.08 x 25.4 cm) lumber length, called mud, which helps ensure stability. Depending on the ground, it should be compacted and filled with gravel if soft or muddy. Jackscrews can be used to perform small scaffolding.
scaffolding levels should be built one by kindand each level should be completed before work on the next start. This is a critical problem with the construction of scaffolding - all level elements must be introduced and secured to support the next level. Vertical test tubes should be plumber levels and horizontal components and reinforced to maintain a square; It is advisable to check the components with the level regularly. The scaffolding from the square is inherently unstable and threatens those who work on it, as well as those who work or walk nearby.
tube, couplings and braces must be easily connected for fastening. No components should be forced to adapt because it is excessive pressure throughout the structure that can endanger its integruits. Parts that are not easy to fit
Likewise, all fasteners should be firmly useful; Shaken nuts and screws should be discarded. Wires and other approaches to components cannot be tolerated when construction of scaffolding. The only orthosis that is poorly secured rOvnatka, and its failure could lead to failure of the whole scaffold.
All scaffolding levels should be equipped with boards where workers can stand and move. The boards should be attached to the scaffold framing to avoid tilting or sliding. There should be a minimum gap between the boards - generally no more than 1 inch (2.54 cm). Each level of scaffolding should also be equipped with a railing.