What Is a Carrying Cost?

The secondary handling fee is a measure cost in the construction project

Secondary handling fee

Right!
The secondary handling fee is a measure cost in the construction project
Chinese name
Secondary handling fee
Foreign name
no
Definition
Cost of measures in construction projects
Calculation method
Direct engineering cost × secondary transportation fee rate (%)
The content of the secondary transportation fee:
It refers to the secondary transportation expenses incurred due to special circumstances such as the narrow construction site.
A variety of building materials used in general construction projects, including finished and semi-finished components, should be transported to the designated location of the construction site and stacked according to the design requirements of the construction organization; however, some construction sites are subject to narrow construction sites or traffic conditions The difference makes it difficult for the transportation vehicle to reach the designated place directly, and the cost required for the second or multiple transfers by a trolley or manpower is called the secondary handling fee for materials.
Calculation method:
Secondary transportation fee = direct engineering cost × secondary transportation fee rate (%)
Rate of secondary moving fee (%) = annual average secondary moving fee expenditure / (annual production value of construction and safety × direct engineering cost as a percentage of total cost (%))

IN OTHER LANGUAGES

Was this article helpful? Thanks for the feedback Thanks for the feedback

How can we help? How can we help?