What Is a Carrying Cost?
The secondary handling fee is a measure cost in the construction project
Secondary handling fee
Right!
- Chinese name
- Secondary handling fee
- Foreign name
- no
- Definition
- Cost of measures in construction projects
- Calculation method
- Direct engineering cost × secondary transportation fee rate (%)
- The secondary handling fee is a measure cost in the construction project
- The content of the secondary transportation fee:
- It refers to the secondary transportation expenses incurred due to special circumstances such as the narrow construction site.
- A variety of building materials used in general construction projects, including finished and semi-finished components, should be transported to the designated location of the construction site and stacked according to the design requirements of the construction organization; however, some construction sites are subject to narrow construction sites or traffic conditions The difference makes it difficult for the transportation vehicle to reach the designated place directly, and the cost required for the second or multiple transfers by a trolley or manpower is called the secondary handling fee for materials.
- Calculation method:
- Secondary transportation fee = direct engineering cost × secondary transportation fee rate (%)
- Rate of secondary moving fee (%) = annual average secondary moving fee expenditure / (annual production value of construction and safety × direct engineering cost as a percentage of total cost (%))