What Is a Boilerplate Code?

The model project can be used as a model for some types of projects, which meets a certain scale and obtains certain standards for project engineering. The definition of model projects and standards in different countries and regions are different.

sample project

Right!
The model project can be used as a model for some types of projects, which meets a certain scale and obtains certain standards for project engineering. The definition of model projects and standards in different countries and regions are different.
Chinese name
sample project
Area
Guangdong Province
Content
Defined model projects vary by region
Types of
Noun analysis
Contents of the Guangdong Province Excellent Model Project Selection (Revision):
Chapter I General Provisions
The first is to implement the "hundred-year plan, quality first" policy, implement the State's "Regulations on the Quality of Construction Projects", establish an incentive mechanism for excellence in construction quality, and encourage construction enterprises to adopt advanced science and technology and management methods to strengthen project management Further improve the quality level of construction projects in our province and formulate these measures.
Article 2 The title of the Guangdong Excellent Model Project (hereinafter referred to as the "Provincial Excellent Model Project") is the highest honor award for the engineering quality of the construction industry in our province and is selected once a year. The selection of provincial excellent model projects was organized and implemented by Guangdong Construction Industry Association. The selection activities are subject to the supervision and guidance of the provincial construction administrative department, and the selection results are announced after being filed by the provincial construction administrative department.
Article 3 The selection of provincial excellent model projects is contracted by Chinese construction enterprises in Guangdong Province, and has been completed and put into use for one year. All types of projects whose quality has reached the first-class level in the province mainly include: housing construction projects, Municipal infrastructure engineering, industrial equipment installation engineering and railway, transportation, water conservancy, power and other professional projects.
Article 4 The honorary title of excellent model project of the province shall be voluntarily declared by the construction enterprise, and recommended by the prefecture-level city construction industry association or provincial competent construction enterprise department or the provincial railway, transportation, water conservancy, electric power and other professional departments where the project is located The industry association formed an expert jury to evaluate and select the best. The assessment work is based on the "Building Law of the People's Republic of China" and national and provincial laws, regulations, mandatory technical standards, and industrial technical standards on the quality of construction projects. And comprehensive evaluation of the quality of the physical project.
Chapter II Application Scale
Article 5 Within the administrative region of this province, projects that meet the requirements of the following provisions can participate in the application for selection.
(I) Civil Construction Engineering
1. Tourism projects with more than 150 guest rooms, stadiums with more than 3,000 seats, stadiums with more than 20,000 seats, theaters or auditoriums with more than 1,000 seats, commercial and residential projects with a construction area of over 6,000 square meters, and over 5,000 square meters Civil buildings for other uses.
2. The overall civil building complex with a total construction area of 40,000 square meters or more (including 40,000 square meters), complete supporting facilities and can be put into normal use.
3. Reconstruction or construction of ancient buildings with a construction area of more than 1500 square meters.
4. Villa projects can be declared for groups of more than 20 (including 20) with a cumulative construction area of not less than 10,000 square meters.
5. The initial renovation area of the above project shall not exceed 25%, and the initial renovation part must meet the use function.
(2) Industrial building and equipment installation engineering
1. Auxiliary and supporting production facilities and warehouses with a single building area of 10,000 square meters or more.
2. Auxiliary supporting complete industrial buildings with a construction area of over 20,000 square meters.
3. A relatively independent industrial equipment installation project with an investment of more than 10 million yuan or a complete production line.
(3) Municipal Engineering
Urban roads, bridges, tunnels, subways, sewage treatment plants, water plants, water supply systems, drainage systems with investment of more than 50 million yuan in urban planning areas in the province, flood control and waste treatment plants (fields) with investment of more than 20 million yuan Municipal infrastructure works. .
(IV) Traffic Engineering
1. Newly constructed and rebuilt highway projects with a standard of Grade II or above and a total length of 20 kilometers or more.
2. Newly constructed and rebuilt independent bridges with a total length of 400 meters or a single span of more than 90 meters.
3. Inland river port and wharf projects with a length of 60 meters and over 500 tons; coastal wharf projects with a length of 80 meters and over 1,000 tons.
4. Ship locks with a navigation capacity of more than 100 tons.
(V) Electric Power Engineering
1. Power plant (station) with a single unit capacity of 135MW or more.
2. Hydropower station with a total installed capacity of more than 25MW.
3. Transformer substation, the voltage level is above 220KV.
4. Transmission line, voltage level is above 500KV, line length is above 15KM, cost is over 100 million yuan.
(6) Railway engineering
1. Marshalling stations, stations with an investment of 25 million yuan or more, or integrated projects of 25 kilometers and more.
2. Double-line tunnels with a length of 1 km or more or single-line tunnels with a length of 2 km or more.
3. Bridge projects with a bridge length of 800 meters or more or an investment of 25 million yuan or more.
(VII) Water Conservancy Project
The scale of the project is the main project of a reservoir with a total storage capacity of 25 million cubic meters or more or a water conservancy project with a cost of more than 30 million.
(8) Other projects
1. The use of new structures, new technologies, new materials, and new technologies is of great significance to the development of the national economy.
2. Projects with significant economic and social benefits, excellent engineering quality, representative, landmark, and special commemorative significance.
Chapter III Declaration Conditions
Article 6 The excellent sample project declared by the province shall also meet the following requirements:
(1) Comply with capital construction procedures, mandatory standards for engineering construction, and regulations on energy conservation and environmental protection.
(2) The completion and acceptance procedures of the project are legal, have passed the completion acceptance filing, and have been used in spring and winter.
(3) The engineering technical data is true and complete, conforms to the requirements of the "Uniform Use of Technical Data for Construction and Acceptance of Construction Projects in Guangdong Province" and the requirements of urban construction archives, and can reflect the quality control process of the construction.
(4) Each unit's project complies with national acceptance standards, the main structure has no common quality problems such as cracks, leaks, and seepages, and its equipment system is complete, meeting environmental protection and building energy-saving requirements.
(5) The project has won the excellent project of the competent department of the construction company listed on the prefecture level or directly under the provincial government. The provincial railway, transportation, water conservancy, and power engineering must receive the excellent project award of the professional department (hereinafter referred to as the excellent project award of the municipal or provincial industry department) .
(6) The project meets the functional requirements of the project, and there are design, supervision, construction, and use units, quality and safety supervision departments and the municipal construction industry association where the project is located, or the competent department of the construction enterprise directly under the province, and the professional department of the province appraise the quality of the project.
(7) The project has applied more than five new construction technology (2005) ten new technologies (2005) promoted by the Ministry of Construction.
Article 7 The contracting, participating, supervising unit and project manager applying for the provincial excellent model project must meet the following requirements:
(1) The undertaking, participation, and supervision units are independent legal persons, and the project manager and supervision engineer are registered builders and registered supervision engineers of the corresponding units, respectively.
(2) The contractor is the general contractor for the declared project, or the consortium of construction units listed in the bid winning notice; for large-scale construction projects, two or more (including two) enterprises respectively sign contract with the construction unit, If more than 20% of the construction and installation workload is completed, the relevant enterprises can jointly declare.
(3) The participating units are legally subcontracted units. The workload of the construction part completed by each participating unit must reach more than 10% of the construction and installation volume of the declared project.
Article 8 For group projects applying for provincial excellent model projects, the construction company with the most completed projects will be declared as the contractor; if the group projects are contracted by multiple construction companies, the construction unit will report the same amount. The unit selects no more than 3 construction enterprises from the construction units as the participating units for declaration.
Article 9 Projects under any of the following circumstances shall not be included in the selection scope:
(1) Projects that violate legal construction procedures.
(2) Subcontracting or subcontracting the entire project or subcontracting the main project.
(3) Projects that violate national mandatory technical standards.
(4) Projects that do not meet the building energy efficiency acceptance standards and do not meet national acceptance standards.
(5) Projects with major quality liability accidents during construction, or hidden quality problems in the main structure, or permanent quality defects caused by quality accidents.
(6) Projects that have not been completed in accordance with the design requirements and the construction contract, and the initial renovation area accounts for more than 25% of the total area (calculated based on the construction area).
(7) Projects not built in Guangdong Province in accordance with China's technical standards.
(8) Projects concealed and difficult to inspect after completion.
(9) Confidential works.
(10) Projects that owe wages to migrant workers.
(11) Projects that have not received the Excellent Project Award from the competent department and professional department of a prefecture-level city or provincial-level enterprise.
(12) The "Twenty Measures for the Treatment of Common Quality Diseases of Construction Projects in Guangdong Province" have not been implemented, and there have been many complaints of quality common diseases.
(13) The engineering technical data does not use the current "Uniform Table of Technical Data for the Completion and Acceptance of Construction Projects in Guangdong Province", making it difficult to check the engineering quality management process.
Chapter IV Declaration Procedure
Article 10 Procedures for Provincial Excellent Model Projects:
(1) For projects declared in various regions, the city construction industry association where the project is located organizes peer experts to conduct a preliminary review of the data and quality inspection of the project entity, and recommends and uniformly recommends the application to the Provincial Construction Industry Association.
(2) For projects declared by the competent provincial construction enterprise department and the provincial railway, transportation, water conservancy, electric power and other professional departments, the above-mentioned departments will organize peer experts to conduct preliminary review of the information and quality inspection of the project entity, and recommend and apply to the Provincial Construction Industry Association .
(3) The time for accepting the application shall be notified separately by the Guangdong Construction Industry Association.
Article 11 Contents of the Provincial Excellent Model Project Data:
(1) "Application Form for Excellent Model Projects of Guangdong Province".
(2) A photocopy of the Report and Approval of Project Application.
(3) A copy of the "Notice of Winning the Bid".
(4) Copies of the "Construction Contract" (including the subcontract of the participating unit), the "Supervision Contract", the "Certificate of Registered Builder", and the "Certificate of Registered Supervision Engineer".
(5) A photocopy of the Construction Permit.
(6) A photocopy of the Record of Completed Project Acceptance Records.
(7) A photocopy of the Engineering Quality Supervision Report.
(8) A copy of the "Project Supervision Unit's Evaluation Report on Project Quality".
(9) Copies of the "Project Completion Acceptance Report" and the special energy-saving acceptance report.
(10) A photocopy of the Fire Acceptance Report.
(11) A photocopy of the Planning Acceptance Report.
(12) The prefecture-level or provincial direct construction enterprise competent department and the provincial railway, transportation, water conservancy, electric power and other professional departments of the excellent project award certificate or a copy of its certification document.
(13) The construction unit and the supervision unit shall issue certification materials on the absence of arrears of wages of migrant workers and subcontracting unit construction funds.
(14) Eight photos reflecting the project's general situation and quality status.
(15) For residential projects, submit an effective quality return visit questionnaire of not less than 80% of the total number of households.
Article 12 Requirements for the application of provincial excellent model project data:
(I) "Guangdong Excellent Model Project Application Form" in duplicate, bound separately.
(2) Other materials are bound into a booklet and compiled into a catalogue.
(3) For the projects declared in each area, the original documents shall be verified by the Municipal Construction Industry Association. After verification, the copies shall be stamped and signed to confirm that they are consistent with the originals.
(4) For the projects declared by the provincial competent construction enterprise authorities and the provincial railway, transportation, water conservancy, electric power and other professional departments, the provincial construction industry association shall verify the original documents.
(5) The application materials must be accurate and true; the documents, certificates and seals provided must be clear and easy to identify.
Chapter V Review
Article 13 The Guangdong Provincial Construction Industry Association conducts a preliminary review of the application materials of the recommended projects in accordance with these Measures, and informs the recommending unit of the projects that have not passed the preliminary review and returns relevant materials.
Article 14 The recommended project shall undergo on-site review after passing the preliminary examination. According to the number of projects, several expert groups are organized to carry out comprehensive technical information and quality inspection of the project entities, and put forward review opinions.
Article 15 Inspection methods and contents of substantive engineering:
(I) Hear the construction and quality introduction of the contractor.
(2) Hear the evaluation opinions of the users on the project quality.
(3) Consult all project management data.
(4) On-site inspection quality level.
(5) The expert team will review the quality of the declared project after the inspection of the data and the physical quality of the project in each region (department), but the results of the review will not be announced.
Article 16 The expert group submits a written evaluation report according to the inspection situation. The Provincial Construction Industry Association constitutes an evaluation committee to conduct a comprehensive evaluation and selection of the approved project to determine the winning project, and report to the provincial construction administrative department for the record.
Chapter Six Commendation
Article 17 The Provincial Construction Industry Association shall award award certificates and personal honorary certificates to the registered builders and registered supervision engineers of the contractor, contractor, supervisor, and other units and contractor units that have obtained provincial excellent model projects.
Article 18 The winning units, registered builders, and registered supervision engineers shall be announced and commendable.
Article 19 The award-winning practising builders and those who directly contribute may be awarded a one-time reward in accordance with the Regulations on Rewards and Punishments for Enterprise Employees (Guo Fa [1982] No. 59), and the award results shall be recorded in the files for assessment and promotion Reference.
Article 20 Among the projects that have obtained the provincial excellent model project, the merit is recommended as the candidate project of Luban Award.
Chapter VII Disciplinary Discipline
Article 21 The reporting unit must be realistic and must not falsify or feed valuables and currency to review experts and staff. Violators will be given criticism and education according to the severity of the circumstances, until the cancellation of the declaration and the cancellation of the award.
Article 22 The municipal construction industry associations and relevant units directly under the provincial government must strictly complete the preliminary examination, adhere to high standards and strict requirements, be serious and serious, and must not falsify or use evaluation work to facilitate the receipt of valuables and currency from the reporting unit. Violators will be criticized and educated according to the seriousness of the circumstances until the punishment of the city (department) 's qualification to declare all or part of the project is cancelled.
Article 23 Experts and staff members participating in the evaluation of excellent model projects in the province must act impartially, conduct behaviors, keep secrets, and be honest and self-disciplined. Violators will be criticized and educated according to the seriousness of the situation until their qualifications for participating in the review are disqualified, and their units will be notified of the disciplinary violations.
Article 24 No unit or individual may copy the award certificate, personal honor certificate and trophy of the provincial excellent model project. Violators will be held liable.
Chapter VIII Supplementary Provisions
Article 25 The Provincial Construction Industry Association is responsible for setting up the provincial excellent model project selection expert database, and selecting those who have rich experience in project quality management and have a title of senior engineer or higher in principle as experts in the expert database. Experts will be selected by the expert bank to participate in the annual review. The expert library is updated every three years.
Article 26 Projects that have won the Provincial Excellent Model Engineering Award may have permanent signs inlaid and engraved in appropriate parts of the building according to the specifications.
Article 29 After the results of the review are announced, the award-winning project is found to be inconsistent with the conditions for the award. Provincial construction administrative department for the record.
Article 30 These Measures shall be implemented as of June 1, 2008.