What Are Some Standard Home Inspection Forms?

House acceptance means that when the buyer receives the property, the buyer must ask the seller to accompany the site inspection again to see if there is any change, whether it has been repaired and transformed according to the contract requirements, whether the quality and level of the repair and reconstruction are satisfactory, and whether the relevant documents are consistent and complete. Examine carefully. The developer's delivery obligations can only be fulfilled if the purchaser inspects the house, signs the house transfer order, and receives the house keys.

House acceptance

I. Door inspection
Inspection standard
I. Pay attention to timely receiving the notice of occupancy
1. This is the first step in closing a house. Pay attention to deadlines. Generally, the time limit for house delivery agreed by the developer is within 30 days after the notice is sent, so buyers must arrange the time.
2. After receiving the notice of occupancy, you should first determine whether the developer has handed in the house as scheduled. If the house is overdue, it shall submit a handling opinion, and decide whether to go to the house based on the developer s response, and go to the house at the time agreed on the notice.
Special Note:
1. Pay attention to the deadline for repossession. It is more troublesome to miss the repossession date.
2. The closing date can be early but not postponed. If the actual delivery date exceeds the agreed date on the contract, you can consider claiming against the developer according to the contract.
3. If there are special circumstances that cannot arrive on time, you can entrust relatives, friends, and lawyers in writing, or you can contact the developer in time, negotiate a separate time, and confirm in writing. 4. If the buyer does not go to the designated place to complete the relevant house collection formalities within the agreed time, from the legal point of view, it is generally regarded as the developer has actually delivered the house to the buyer. From the date of taking on all house purchase risk liability and taxes.
Determine if the house meets the delivery conditions
1. "Completion and Acceptance Record Form"-the most important "House Construction Engineering and Municipal Infrastructure
Renovation is a hassle, which has long been the consensus of many owners. Therefore, for those owners who are afraid of trouble and have better economic conditions, buying a fully furnished house is a good choice. However, the purchase of fully furnished rooms does not mean absolute peace of mind. The necessary inspection and acceptance are still necessary when purchasing or checking in. As the decoration process has ended, the quality of the house decoration can no longer be inspected. It can only be started from some subtle points. The following will introduce the relevant inspection points of the fully decorated house. It is also a good reference for the owners who are renovating.
1. Preparation. House inspection is a hard and complicated project. Before the start, the preparation work must be in place. This inspection can be handy. A house purchase contract must be provided, and there are many attachments on the contract that are of great significance to the acceptance of the decorated house, such as the distribution map of the community and the agreed details.
2. The drawings of the room type with dimensions should be prepared before the acceptance of the house, not only the plan of the house, but also the circuit and waterway drawings.
3. Before you accept the house, you must get the keys. There are many keys. There are floor keys, house door keys, water meters, and electricity meter keys. Be careful not to omit them.
4. The confirmation of the decoration materials is also indispensable during the acceptance. The brand, style and model of the materials are recorded on it, which needs to be checked when the fully decorated room is accepted.
5. Acceptance structure. It is found that the structure of the fully-furnished house is inconsistent with the contract. You must raise it with the real estate agent before you move in. If you encounter resistance, you can also report it to the relevant government department. If you only find non-structural problems, you can truthfully make written records when the house is handed over. The supplier promised to carry out maintenance within a certain period of time. The first step is to check the whole of the renovated house, check the area, check the orientation, measure the common area, and check whether some outdoor facilities are intact.
6. Checking the project is often ignored by many owners, and it is considered unlikely that problems will occur. In fact, many owners were surprised to find that the construction project was missing after moving in.
7. The inspection should pay attention to whether the materials used are consistent with the promises in the contract, whether they are well-known brands, whether the models and models correspond, etc. If there are errors, they should be negotiated in time.
8. Such a problem sometimes occurs after the decoration of small high-rises. The height of the high-rise does not match the promise of the developer. The small high-rises that were already nervous before the decoration are more likely to become depressed after the decoration.
9. Whether the balcony can be closed is a problem that owners generally need to pay attention to after receiving the house. Owners who purchase decorated houses must also consider that if the balcony is to be closed in the future, some layouts may need to be changed.
10. Whether the ventilation holes in the bathroom are left well is a link that should not be ignored in the acceptance. You can lift up the ceiling to check whether the pipes are installed in place.
11. Some vacant structures must not be ignored. Pay particular attention to the size and see how it can be used in the future. For example, this gap in the kitchen is not enough to place a refrigerator, which is very embarrassing.
12. Carefully check the drawings to see if the positions of important facilities have changed. The changes should be recorded; the position of this wire box design should have been above the wall. The construction party has made changes, and it is difficult to clarify the responsibility in the future without modifying the design.

IN OTHER LANGUAGES

Was this article helpful? Thanks for the feedback Thanks for the feedback

How can we help? How can we help?