How Do I Do a Cost and Benefit Analysis?
Cost-benefit analysis refers to the method of estimating and measuring input and output based on monetary units. It is a plan made in advance. Under the conditions of a market economy, when any economic subject conducts economic activities, it is necessary to consider the gains and losses of specific economic behaviors in order to have a scientific estimate of the relationship between input and output.
Cost-benefit analysis
Three main methods of cost-benefit analysis
- 1.Net present value method (NPV)
- 2. Present value index method
- 3.Internal rate of return method
- Each of these three methods has its own characteristics and has different applicability. In general, if the investment project is indivisible, the net present value method should be used; if the investment project is divisible, the present value index method should be used, and the project with the higher present value index is preferred; When it can be used for reinvestment, the IRR method can be used.
Cost-benefit analysis procedure steps
- The cost-benefit analysis process includes the following four steps:
- 1.First clarify related costs and benefits
- 2. Then calculate these costs and benefits
- 3.Then compare the costs and benefits incurred during the life of the project
- 4. Finally select the project.
- The cost-benefit analysis method mainly includes the following:
- (1) Define and estimate expected costs and benefits from a social perspective rather than a central (federal) government perspective.
- (2) In the calculation of cost-benefit, the cost should be defined by opportunity cost, and incremental costs and benefits should be used instead of sunk costs.
- (3) In the calculation of net income, only the actual economic value is calculated, excluding transfer payments; transfer payments are considered only when the issue of distribution is discussed.
- (4) In calculating costs and benefits, the concept of consumer surplus must be used; moreover, the willingness to pay must be estimated directly or indirectly.
- (5) Market prices provide an inestimable starting point for the calculation of costs and benefits, but in the presence of market failures and price distortions, shadow prices have to be used.
- (6) Whether a public project is acceptable or not is determined based on the NPV standard, in which the internal rate of return is calculated.
- (7) When using the NPV standard, it is necessary to analyze not only the actual discount rate but also the sensitivity to various other discount rates.