What Is an Approved Vendor List?

The full translation of PPAP: Production part approval process. The PPAP specifies the general requirements for the approval of production parts, including production parts and bulk materials. The purpose of PPAP is to determine whether the supplier has correctly understood all the requirements of customer engineering design records and specifications, and whether its production process has potential capabilities, and in the actual production process, products that meet customer requirements at a specified production cycle.

PPAP

(Production part approval procedure)

Full text translation of PPAP: Production part approval process .
PPAP process
"Must" appear in this article (
1) Determine if the supplier has correctly understood all requirements of customer engineering design records and specifications.
2) And in the actual production process under the required production cycle conditions, it has the potential to continuously meet these requirements.
first part
I.1 General
For the following situations, the supplier must obtain full approval from the customer's product approval department.
1. New parts or products (special parts that have never been provided to customers before,
1. Overview of Product Part Approval Process ( PPAP )
[Definition and purpose of PPAP]
PPAP applicability
PPAP process requirements
2.Submission of PPAP
[Submission requirements]
-summary
Customer notification and submission requirements
When to submit
When not to submit
Whether or not to submit
[Part submission status]
Full, provisional approval
Resubmit PPAP situation
Customer rejection
3 , PPAP process requirements
-Size number of design record
-Authorized Engineering Change Document
-IMDS report sample
-Performance index for initial process studies
-Qualified laboratories
-Appearance Approval Report (AAR)
-Production part samples and approval samples
-Inspection aid
-Specificity of customer design record requirements
-Difference from customer's special requirements
4. Record keeping requirements
-Record retention time
-Inclusion or reference of usage records
[Target trainee] System engineer, GE, product / process design engineer, quality management supervisor and related personnel
[Training background]
How to meet customer needs? How to ensure the stability of output quality? How to pass the customer's recognition of our products? Today's advanced quality management concepts are based on the methods of process, preventive measures, and continuous improvement. They would rather spend some time and manpower in advance from product design and process technology development to ensure that the product's advanced quality is planned and perfected to ensure that subsequent production is reduced and reduced And waste.
Differences between PPAP Third Edition and PPAP Fourth Edition:
Increased requirements for trucks.
Reduce some form requirements.
More emphasis on the awareness of meeting the requirements of OEMs.
[Training Features]
Group discussion / publishing, seminar, case analysis, scenario simulation, on-site diagnosis and implementation countermeasures with enterprise data, game sharing, interaction between students and students, lecturers
In-depth explanations and explanations, accompanied by in-class exercises to help students master the knowledge and then apply what they have learned.
Form of group discussion.
[Training Outline]
First, PPAP process requirements
Second, the important production process
Third, PPAP requirements
Design records
Engineering change files
Project approval
Design failure mode and consequence analysis
Process flow chart
Process failure mode and consequence analysis
Size results
Record of material / performance test results
Initial Process Study (PPK)
Measurement System Analysis and Research (MSA)
Document requirements for qualified laboratories
Control Plan (CP)
Parts Submission Warrant (PSW)
Appearance report
Requirements for bulk materials
Production sample
Standard samples
Inspection aids
Special customer requirements
Fourth, customer notification and submission requirements
Five, customer submission level
Six, part submission status
Fully approved
Provisional approval
Rejection
Record keeping
Eight, special instructions
Special instructions from DaimlerChrysler
10.Special instructions from Ford
Eleven special instructions from General Motors

IN OTHER LANGUAGES

Was this article helpful? Thanks for the feedback Thanks for the feedback

How can we help? How can we help?