What Is an Approved Vendor List?
The full translation of PPAP: Production part approval process. The PPAP specifies the general requirements for the approval of production parts, including production parts and bulk materials. The purpose of PPAP is to determine whether the supplier has correctly understood all the requirements of customer engineering design records and specifications, and whether its production process has potential capabilities, and in the actual production process, products that meet customer requirements at a specified production cycle.
PPAP
(Production part approval procedure)
- Full text translation of PPAP: Production part approval process .
- PPAP process
- "Must" appear in this article (
- 1) Determine if the supplier has correctly understood all requirements of customer engineering design records and specifications.
- 2) And in the actual production process under the required production cycle conditions, it has the potential to continuously meet these requirements.
- first part
- I.1 General
- For the following situations, the supplier must obtain full approval from the customer's product approval department.
- 1. New parts or products (special parts that have never been provided to customers before,
- 1. Overview of Product Part Approval Process ( PPAP )
- [Definition and purpose of PPAP]
- PPAP applicability
- PPAP process requirements
- 2.Submission of PPAP
- [Submission requirements]
- -summary
- Customer notification and submission requirements
- When to submit
- When not to submit
- Whether or not to submit
- [Part submission status]
- Full, provisional approval
- Resubmit PPAP situation
- Customer rejection
- 3 , PPAP process requirements
- -Size number of design record
- -Authorized Engineering Change Document
- -IMDS report sample
- -Performance index for initial process studies
- -Qualified laboratories
- -Appearance Approval Report (AAR)
- -Production part samples and approval samples
- -Inspection aid
- -Specificity of customer design record requirements
- -Difference from customer's special requirements
- 4. Record keeping requirements
- -Record retention time
- -Inclusion or reference of usage records
- [Target trainee] System engineer, GE, product / process design engineer, quality management supervisor and related personnel
- [Training background]
- How to meet customer needs? How to ensure the stability of output quality? How to pass the customer's recognition of our products? Today's advanced quality management concepts are based on the methods of process, preventive measures, and continuous improvement. They would rather spend some time and manpower in advance from product design and process technology development to ensure that the product's advanced quality is planned and perfected to ensure that subsequent production is reduced and reduced And waste.
- Differences between PPAP Third Edition and PPAP Fourth Edition:
- Increased requirements for trucks.
- Reduce some form requirements.
- More emphasis on the awareness of meeting the requirements of OEMs.
- [Training Features]
- Group discussion / publishing, seminar, case analysis, scenario simulation, on-site diagnosis and implementation countermeasures with enterprise data, game sharing, interaction between students and students, lecturers
- In-depth explanations and explanations, accompanied by in-class exercises to help students master the knowledge and then apply what they have learned.
- Form of group discussion.
- [Training Outline]
- First, PPAP process requirements
- Second, the important production process
- Third, PPAP requirements
- Design records
- Engineering change files
- Project approval
- Design failure mode and consequence analysis
- Process flow chart
- Process failure mode and consequence analysis
- Size results
- Record of material / performance test results
- Initial Process Study (PPK)
- Measurement System Analysis and Research (MSA)
- Document requirements for qualified laboratories
- Control Plan (CP)
- Parts Submission Warrant (PSW)
- Appearance report
- Requirements for bulk materials
- Production sample
- Standard samples
- Inspection aids
- Special customer requirements
- Fourth, customer notification and submission requirements
- Five, customer submission level
- Six, part submission status
- Fully approved
- Provisional approval
- Rejection
- Record keeping
- Eight, special instructions