What Is a Synthetic Lease?
Plant lease contract Lessor (hereinafter referred to as Party A) Lessee (hereinafter referred to as Party B).
Plant lease contract
- Chinese name
- Plant lease contract
- Foreign name
- Workshop lease contract
- Double
- Lessor, lessee
- Condition
- Reached through friendly consultations
- comply with
- legal
- Plant lease contract Lessor (hereinafter referred to as Party A) Lessee (hereinafter referred to as Party B).
- According to relevant laws and regulations, the two parties reached the following plant lease contract terms through friendly negotiation for compliance.
- Plant lease contract
- Lessor (hereinafter referred to as Party A):
- Lessee (hereinafter referred to as Party B):
- According to relevant laws and regulations, the two parties reached the following plant lease contract terms through friendly negotiation for compliance.
- First
- Location, area, function and use of leased property
- 1.1 The factory building (hereinafter referred to as the leased property) located at _____________________ is leased to Party B for use. The leased area is ___ square meters.
- 1.2 The leased property is leased and managed by Party B.
- Article 2
- term of lease
- 2.1 The lease term is __year, that is, from ____year__month__ to ____year__month__.
- 2.2 It was proposed one month before the expiration of the lease term. After Party A's consent, both Party A and Party B will re-sign a lease contract on the relevant lease. Under the same lease conditions, Party B has priority.
- Article 3
- Plant lease costs and related matters
- 3.1 Rent
- The rent is RMB__________ (uppercase) per year.
- 3.2 Power supply, water supply, and others in order to enable Party B to produce normally.
- 3.3 Party A is responsible for handling disputes caused by property rights such as plant land. If Party B fails to produce normally, Party A shall return the remaining rent for that year.
- 3.4 The leased property of Party B has the right to use it free of charge.
- 3.5 Deposit
- Party B shall pay a one-time deposit of RMB 100,000 to Party A before signing the contract.
- Article 4
- Payment of rental costs
- The annual payment is the payment of the second year rent on __month__, that is, one year of rent is paid each time.
- The fifth
- Transfer of leased property
- 5.1 During the lease period, Party B is not allowed to sublet, and it is not allowed to operate multiple projects at the same time. It is only used by Party B to operate the hotel.
- 5.2 If Party A's actions lead to Party B's failure to produce normally, Party A shall refund Party B's rent for the corresponding time.
- Article 6
- Site maintenance, construction.
- 6.1 Party B enjoys the exclusive right to all facilities of the leased property during the lease period. Party B shall be responsible for the maintenance of related facilities in the leased property and shall guarantee that Party A shall be returned intact at the termination of this contract.
- 6.2 Party B shall take care of the leased property during the lease period. Due to Party B's improper use, the leased property is damaged. Party B shall be responsible for repairs at the expense of Party B.
- 6.3 For the normal production needs, Party B shall fix the construction of fixed assets in the leased property separately by both parties.
- 6.4 During the lease, if the house is damaged due to reasons other than Party B or the roof is leaking, the maintenance cost shall be borne by Party A. Party B shall have the right to repair it, but the cost shall be borne by Party A.
- Article 7
- Sublease of leased property
- During the tenancy period, Party B may not sublet the leased property without Party A's consent.
- eighth
- Termination of contract
- If this contract is terminated early or the validity period expires, if Party A and Party B have not reached an agreement to renew the lease, Party B shall remove the leased property and return it to Party A on the date of termination or the expiration of the lease term.
- Article 9
- Applicable law
- Subject to this contract
- Signing a factory lease contract is a common legal activity. In order to protect the legal and reasonable interests of the company in leasing the factory building as much as possible and avoid unnecessary disputes during the lease process, the relevant terms should be clearly agreed, so the contract must be signed with caution Be careful.
- I. Review the basic situation of the lessee and lessor
- 1. The main contents of the lessor should be understood:
- Whether the relevant procedures of the leased place are complete. Example: Does the factory building have legal property right certificates? Is it a joint property right? Can it be used normally and not classified as a dangerous house? Whether it is illegal construction, etc.
- Basic information of the leased property, such as the location of the leased place, the actual effective area of the leased place, the function of the leased place, and the facilities and equipment of the leased place.
- 2. The main contents that the lessee should know are:
- Legal status; Business scope; Social reputation; Financial situation; Performance ability is the issue of funds.
- The above content is an indicator of the basic situation of the two sides and should be carefully analyzed and judged.
- 2. Terms of the rental contract and related expenses
- (One)
- Lessor (Party A):
- Lessee (Party B):
- According to relevant state regulations, on the basis of voluntary, equal, and mutually beneficial parties, Party A and Party B have reached an agreement and signed a contract regarding the lease of the factory owned by Party A to Party B for use as follows:
- I. Leased Plants
- The factory leased by Party A to Party B is located in a building with a leased building area of square meters. The type of plant is, structure.
- Second, the plant starting date and lease period
- 1. The factory decoration date is from month to month. No rental fee during renovation.
- 2. The leasing of the plant starts from the date and ends on the date. The lease term is years.
- 3. When the lease term expires, Party A has the right to take back the leased plant. Party B should return it as scheduled. If Party B needs to continue the lease, it should submit a written request to Party A three months before the lease term expires and re-sign the lease after Party A agrees. contract.
- 3. Payment methods of rent and security deposit
- 1. Both parties A and B agree that the daily rent of the factory building per square meter of building lease is RMB. The monthly rent is RMB and the annual rent is RMB.
- 2. The annual rent in the first year is unchanged, and the increasing rate from the second year is 3% -5%.
- 3. Once Party A and Party B have signed the contract, Party B shall pay Party A a guarantee for the lease of the workshop, which shall be one month's rent. The rent shall be paid in advance for three months, and the rent shall be paid to Party A before the payment date on the 5th.
- 4. Other expenses
- 1. During the lease period, the communication costs of water, electricity, gas, telephone, etc. incurred by the use of the plant shall be borne by Party B and shall be collected.
- Upon receipt or invoice, payment should be made within thirty days.
- 2. During the lease period, Party B shall pay the property management fee on a monthly basis. The daily property management fee per square meter is RMB.
- V. Plant use requirements and maintenance responsibilities
- 1. During the lease, if Party B finds that the factory building and its auxiliary facilities are damaged or malfunctioning, it shall promptly notify Party A to repair it; Party A shall perform maintenance within 3 days after receiving the notification from Party B. If it fails to repair within the time limit, Party B may perform the repair on its behalf, and the cost shall be borne by Party A.
- 2. During the lease, Party B shall use and take care of the factory building and its auxiliary facilities reasonably. If Party B's improper or unreasonable use causes damage or malfunction to the plant and its auxiliary facilities, Party B shall be responsible for maintenance. Party B refuses to repair, Party A can do the repairs on its behalf, and the cost shall be borne by Party B.
- 3. During the lease, Party A guarantees that the plant and its auxiliary facilities are in a normal usable and safe state. Party A shall inspect and maintain the plant 3 days in advance. Party B shall cooperate in the inspection and maintenance. Party A shall reduce the impact on Party B's use of the plant.
- 4. If Party B needs to renovate or add auxiliary facilities and equipment, Party A must obtain the written consent of Party A in advance, and must be approved by the relevant department according to the regulations, then Party A should also report to the relevant department for approval before proceeding.
- 6. Subleasing and return of factory buildings
- 1. During the lease period, if Party B subleases the plant, Party A's written consent must be obtained in advance. If the sublet is transferred without authorization, Party A will not refund the rent and security deposit.
- 2. After the lease expires, the plant should be returned to normal use.
- Seven, other relevant agreements during the lease
- 1. During the lease period, both parties A and B shall abide by the laws and regulations of the state, and shall not use the plant leasing for illegal activities.
- 2. During the lease, Party A has the right to urge and assist Party B to do a good job in fire protection, safety and sanitation.
- 3. During the lease period, the contract cannot be performed due to irresistible reasons and municipal relocation. The two parties shall not bear any responsibility.
- 4. During the lease period, Party B can carry out decoration according to its own operating characteristics, but in principle, it must not damage the structure of the original house.
- 5. During the lease period, Party A provided the door phone to Party B for free. If you need a phone above the door, the cost will be borne by Party B.
- 6. During the lease period, Party B shall pay the rent and all other expenses payable in a timely manner. If arrears are not paid for one month, Party A has the right to increase the late payment by 11% and terminate the lease agreement.
- 7. After the lease term expires, if Party A continues to lease the house, Party B has priority; if the lease is no longer available, Party B shall relocate as scheduled, otherwise all losses and consequences caused by it shall be borne by Party B.
- Eight other terms
- 1. During the lease period, if Party A terminates the contract early and breaches the contract, Party B shall compensate Party B for three months' rent. During the lease period, if Party B cancels the lease in advance and breaches the contract, Party A shall compensate Party A for three months of rent.
- 2. During the leasing period, if Party B's normal operation is affected due to the problem of the property right certificate, Party A shall bear all responsibility for compensation.
- 3. Party A can handle the relevant procedures such as business license on behalf of Party A, and the expenses shall be borne by Party B.
- 4. After the lease contract is signed, if the name of the company changes, it can be signed and confirmed by both parties A and B. The original lease contract terms remain unchanged and execution continues until the contract expires.
- 5. When the power supply bureau collects electricity charges from Party A, Party A will charge a discounted fee per kilowatt of electricity according to Party A's planned electricity consumption, and at the same time charge Party A's actual electricity consumption electricity charges. Therefore, Party A also charges Party B with the planned electricity subsidy fee and the actual electricity fee.
- 9. The matters not covered in this contract must be settled through consultations between the two parties.
- X. This contract is divided in different ways. Both parties hold each other. The contract will be effective after it is signed and signed.
- Lessor: Lessee:
- Authorized Representative: Authorized Representative:
- Account bank: Account bank:
- Account: Account:
- Phone: Phone:
- Signing place:
- Date of signing: