What is the order of change of engineering?

The order of changes in engineering (ECO), also known as the announcement of the Change of Engineering (ECN), is the necessary documentation to complete the request for a change in engineering (ECR). The application for a change in engineering is a formal requirement to make a change to a technical product or process. If the ECR is approved, the order of the engineering change is completed to provide details and specifications necessary to make the required change.

Requirements for changing engineering and orders of changes are necessary to create a thorough "paper trail" - although the trail is often electronic. This paper trail records every change to design, so it's easy to return to the previous iteration if necessary. If it turns out that the new process is less efficient than the old or new material becomes costly, a thorough record of the previous process or product design ensures that the design can be easily returned to the previous version. The documentation also shows the parties to the parties and customers;Acims to solve problems and improvements.

For various reasons, the order of engineering change may be required. If ECO is for the product, designers may have discovered a problem that needs to be solved or a way to fix the weakness in the product. The product may benefit from an upgrade with more advanced technology or design that can be produced, for example, at lower costs. If eco is to change the process, can improve efficiency, lower costs or upgrade software or tools used in the process.

A thorough order of change of engineering updates all drawings and instructions necessary for product production or processing. It also updates all other relevant documents that are affected by changes such as user manuals and product prices. ECO should also include an analysis of how change improves the product or process and how much change is likely to cost. Often includes description of change and also drawingSY with considerable changes.

As soon as an order is created, the engineering change is created, managers and possible parties are approved depending on the type and size of the change. ECO often undergoes several sets of changes during the approval process. Many companies streamline the process using an electronic ecological system that allows multiple users to propose changes in the same document. Once the ECO changes are addressed and approved by all involved, the order of the engineering change is completed and changes can be made.